laitimes

Chongqing Jiulongpo: Pollution Control, Chaos and Landscape Integration, All Departments and All Rectifications

author:Horizon network

More than 8,500 river patrols were carried out by 141 river chiefs through overt inspection and covert visits, cross-border joint visits, and intelligent inspections, and more than 150 river management and protection problems were solved. Fully implement the "ten-year fishing ban" on the Yangtze River, and increase the stocking of nearly 1.5 million fish seedlings. The water quality compliance rate of 3 centralized water sources and 5 water functional areas is 100%. The water quality of the Yangtze River National Examination section has steadily reached the surface water quality standard of Class II. and ranked first in the metropolitan area of the main city... This set of figures is the excellent answer sheet handed over by Jiulongpo District in 2021.

The Jiulongpo District of Chongqing relies on the Yangtze River outside, with 13 reservoirs and 38 rivers inside, and the "one river and three rivers" (Jiulongpo section of the Yangtze River and Daxi River, Jumping River and Taohuaxi) in the area are the main ecological patterns of the waters, with a length of about 80 kilometers. In the past year, Jiulongpo has closely focused on the city's No. 3 total river length order, from one river and three rivers to 13 reservoirs, to build a city's living water ecological water network, to achieve the whole territory of "ecological restoration, urban repair", to do water articles, to do excellent water ecology.

Chongqing Jiulongpo: Pollution Control, Chaos and Landscape Integration, All Departments and All Rectifications

Kowloon Beach Square. (Courtesy of Jiulongpo District River Chief's Office)

Harmony between people and water Promote the upgrading of the main axis of the Yangtze River shoreline

Strolling through Kowloon Beach Square, the original bare fading belt is planted with flowers, and the reeds dance with the wind, adding a touch of vitality to the winter riverbank. Nowadays, this "river beach grassland" with the largest area of "two rivers and four banks" has become a new urban punching point.

Starting from the landmark "Kowloon Ladder", along the 13 river trails down the steps, the public can see the 199-meter Yangtze River map, and continue to go down to the river beach, zero distance to feel the scenery of the Yangtze River. Looking around, in the Jiujian Pier not far away, the naval history theme museum is not reduced in popularity, attracting a large number of citizens to visit, and the beauty of the Yangtze River is perfectly integrated with the characteristic cultural genes of the Kowloon Peninsula.

Chongqing Jiulongpo: Pollution Control, Chaos and Landscape Integration, All Departments and All Rectifications

The Yangtze River Kowloon Bund fading belt, a greenery. (Courtesy of Jiulongpo District River Chief's Office)

"The transformation of Kowloon Beach Square is a microcosm of the 'two rivers and four banks' governance of Jiulongpo District." In 2021, Jiulongpo District will vigorously implement the construction of green mountains and thousands of miles of forest belts on both sides of the strait, complete 1515 mu of greening and beautification and forest care, and complete the treatment area of soil erosion of 17.11 hectares. In order to optimize the ecological environment, 17 illegal docks were rectified, 7 catering ships were banned and dismantled, 1.03 kilometers of shoreline were reclaimed and standardized, 27 illegal use and rectification projects were cleaned up, 5 problems of "cleaning up the four chaos" of the river were rectified, and the contour of the beautiful river bank was further built.

Chongqing Jiulongpo: Pollution Control, Chaos and Landscape Integration, All Departments and All Rectifications

Today's Jumping River. (Courtesy of Jiulongpo District River Chief's Office)

Intercept the source of pollution control to create a butterfly change posture of the jumping river

"Through the three-level river chief to take the lead, the grid supervision horizontally to the edge, vertical to the end, hire professional companies to operate and maintain management, create a smart water system, and the whole people participate in the five measures to form a new pattern of co-management and sharing of the whole society." According to the relevant person in charge of the Jiulongpo District River Chief's Office, in order to further create the "water clear bank green" jumping river, Jiulongpo coordinated river improvement and landscape construction, and organically combined pollution control, water control, shore control and scenery control. With an iron fist to control pollution, complete the dredging of 21.7 kilometers of the main tributaries of the Jumping River, and standardize the collection and transportation of garbage throughout the territory. Scientifically control water, and build an underwater forest river ecosystem of 60,000 square meters composed of microorganisms, algae-eating insects and submerged plants. Accurately control the shore and create a 5.15-kilometer ecological revetment. Sponge transformation of old residential areas, factories, blocks, sponge city area of 15.87 square kilometers. Integrating the scenery and combining the characteristic industrial relics of Zhongliang Mountain, an industrial culture corridor and an urban memory culture wall have been built.

In 2021, the Jumping River was successfully selected as a typical case of national black and odorous water remediation.

Chongqing Jiulongpo: Pollution Control, Chaos and Landscape Integration, All Departments and All Rectifications

Peach Blossom Creek. (Courtesy of Jiulongpo District River Chief's Office)

Symptoms and root causes are reproduced to reproduce the shallow bottom of the peach blossom creek fish

Taohuaxi is located in the urban area, with the development of urban construction, the rain and sewage pipe network on both sides of the strait is overloaded, and water pollution occurs from time to time. In this regard, Jiulongpo District invested 1.549 billion yuan to implement the three-step measures of Taohuaxi to rectify the river, clear water irrigation, and rain and sewage diversion to eradicate water pollution, add more than 88,000 square meters of greening, build 5 kilometers of greenways along the river, remove 320,000 cubic meters of black and odorous silt, and supplement and improve the drainage pipe network of about 45 kilometers. At the same time, the special rectification action of "three rows" of illegal discharge, straight discharge and random discharge of sewage in Taohuaxi was carried out, more than 30 problems such as sewage leakage and overflow caused by the misconnection and damage of the drainage pipe network were solved, and 1.4 hectares of green space along the river shoreline were upgraded and transformed.

Relying on the three-level river length and the grid sweep code river patrol platform, the Taohuaxi River Basin has completed a total of 30,000 river patrols, solved more than 700 problems, cleaned up more than 2,000 tons of garbage, and maintained and rectified more than 200 drainage facilities.

Chongqing Jiulongpo: Pollution Control, Chaos and Landscape Integration, All Departments and All Rectifications

The Daxi River Ecological Corridor. (Courtesy of Jiulongpo District River Chief's Office)

Livable and touristable To build an ecological corridor of the Daxi River

Daxi River is the "mother river" of the three towns in the western part of Jiulongpo District, as the only rural river in the whole district, its governance is different from the improvement of urban rivers.

In 2021, with the help of new urbanization and rural revitalization, Jiulongpo District will concentrate on the construction of the Daxi River Ecological Corridor, carry out environmental governance, ecological restoration, cultural construction and landscape construction throughout the basin, and create an ecological green belt with profound cultural heritage and the atmosphere of the times. At present, the Daxi River Dushan Bridge-Erlangtan Bridge Section Project has been successfully included in the Three Gorges Follow-up Project Database of the Ministry of Water Resources. At the same time, Jiulongpo District took the lead in carrying out rural retail sewage treatment in the city, took the lead in launching the rural "three reforms and one treatment", implemented the comprehensive improvement of the environment of 1,000 households and 200 courtyards, adopted the AO+ contact oxidation method, explored the establishment of a new process for sewage treatment of rural retail households, discharged new standards, and completely solved the problem of manure treatment of rural retail households. Further promote the improvement of the water quality of the Daxi River.

Read on