laitimes

The topping out ceremony of the No. 6 School of Jinghe New Town, Xixian New Area was successfully concluded

author:Real estate Xi'an

【Real Estate Xi'an】:

On May 30, 2024, Jinghe New Town Binjiang Emerald City School has been renamed as Jinghe New Town No. 6 School in Xixian New District. On June 1, 2024, the topping out ceremony of the middle school teaching building, dormitory building and lecture hall of the sixth school of Jinghe New Town, Xixian New District was held in the school playground.

The topping out ceremony of the No. 6 School of Jinghe New Town, Xixian New Area was successfully concluded

Top 100 real estate companies with ingenuity

It is reported that the sixth school of Jinghe New Town in Xixian New District is expected to be handed over in July this year and is expected to open in September. The successful holding of this topping out ceremony not only reflects the operational, construction and delivery strength of Rundafeng Holdings Binjiang Real Estate; It also means that the educational resources of the thousand-acre university city have been clarified, and the educational facilities are constantly being realized, which also marks the education level of Jinghe New Town to a new high.

The topping out ceremony of the No. 6 School of Jinghe New Town, Xixian New Area was successfully concluded

The Sixth School of Jinghe New Town, Xixian New District, was built on behalf of Binjiang Emerald City

The No. 6 School of Jinghe New Town, Xixian New District, is located on the north side of the Binjiang Emerald City project, which is built by Binjiang Emerald City, covering primary and junior high schools. It has a strong teaching force, a superior teaching environment and a classroom scale that far exceeds the national standard; The school's track and field playground is about 15,000 square meters, which can accommodate about 10,000 people, and the stands are exclusively equipped with multi-colored seats; The façade of the teaching building is designed with reference to the aesthetic design of the façade of international cutting-edge schools. High standard and diversified teaching configuration provide children with a high-quality, safe and healthy growth environment, and achieve a bright future for elites.

The topping out ceremony of the No. 6 School of Jinghe New Town, Xixian New Area was successfully concluded

Six details to build a safe campus

➢ The design of the toilet squatting area and the lowering board of the computer classroom realizes barrier-free access to the toilet on the ground and eliminates the potential safety hazards of students tripping and bumping;

➢ The floor of the stairwell is made of 2.0 thick full-body material glue, and aluminum alloy anti-slip strips are added to the ladder surface, which can meet the commercial-grade anti-skid standard and eliminate the potential safety hazards of students slipping;

➢ Safety sockets are selected on campus to eliminate the potential safety hazards of electric shock for students;

➢ The floor of the toilet in the 1# teaching building uses landscape imitation stone bricks, with a surface resistance of 6000 rpm, which greatly improves the anti-effect and eliminates the potential safety hazards of students slipping and falling;

➢ The wall design of the wind and rain playground is 2.2m high soft package facing wall panel to eliminate the potential safety hazards of students;

➢ The corridor uses E0 grade wood floor wall skirting, arc-shaped corner protection strips are set at the sunny corner, and anti-pinch hand strips are designed for door and window joints to avoid bumps and ensure the safety of students.

The topping out ceremony of the No. 6 School of Jinghe New Town, Xixian New Area was successfully concluded
The topping out ceremony of the No. 6 School of Jinghe New Town, Xixian New Area was successfully concluded
The topping out ceremony of the No. 6 School of Jinghe New Town, Xixian New Area was successfully concluded

Six standards to create a healthy growth environment

➢ The floor of the classroom and stairwell is made of 2.0 thick homogeneous and transparent floor glue, and the environmental protection level reaches E0, and the material is environmentally friendly, non-toxic and renewable;

➢ E0 grade bamboo and wood fiber wall skirts are selected in the classroom to avoid students from bumping and protect their health;

➢ Increase the thickness of all classroom doors, and use perforated wood sound-absorbing panels on the walls of music and recording classrooms and lecture halls to achieve better sound insulation;

➢ The base plate is made of E0 grade Osone board, which meets the highest environmental standard of European EN300, and the formaldehyde emission is almost zero;

➢ The wall is made of "water-based Ketian" formaldehyde-free environmental protection latex paint;

➢ UGR≤16 is selected for classroom lamps, which meet and exceed the national standard for eye protection lamps, which provide a good lighting environment and care for students' eyesight.

The topping out ceremony of the No. 6 School of Jinghe New Town, Xixian New Area was successfully concluded
The topping out ceremony of the No. 6 School of Jinghe New Town, Xixian New Area was successfully concluded
The topping out ceremony of the No. 6 School of Jinghe New Town, Xixian New Area was successfully concluded

The school is close to each other, and the good school at the door is about to be presented, and the children's future is one step closer!

——————————————————

The topping out ceremony of the No. 6 School of Jinghe New Town, Xixian New Area was successfully concluded