laitimes

Huairen City: "Summer Preparation and Winter War" is at the right time The "Warm Project" site is busy

author:Shanxi Pictorial Shuozhou

Since the start of the construction of the heating pipe network project of the off-site heating pipeline construction project of Jinkong Electric Power Tashan Power Generation Shanxi Co., Ltd., Huairen Heating Company has cooperated with the project construction unit to promote the construction of the expansion heat source project at full capacity and overtime.

Huairen City: "Summer Preparation and Winter War" is at the right time The "Warm Project" site is busy
Huairen City: "Summer Preparation and Winter War" is at the right time The "Warm Project" site is busy

It is understood that the project investment of more than 67 million yuan is one of the key livelihood facts in Huairen City in 2024. After the completion of the project, 10 million square meters of heating capacity will be added, which is of great significance for alleviating the problem of insufficient heat sources in the city and comprehensively improving the level of heating service guarantee.

Huairen City: "Summer Preparation and Winter War" is at the right time The "Warm Project" site is busy

Urban central heating is related to the warmth and coldness of the masses, and it is also the livelihood of the people of Huairen who are most concerned about. In the next step, Huairen Heating Company will seize the favorable time for construction, strictly control the quality and safety, and do a good job in this practical matter of people's livelihood, and go all out to achieve the goal and task of heating as scheduled this winter, so that the winter of Huairen people will be warmer.

Photo: Wang Xiaoli, Zhao Wanyang

Editor: Ma Shijie

Read on