laitimes

G205 Shanshen Line Road Construction Notice!

author:Fengcheng Condenser
G205 Shanshen Line Road Construction Notice!

Notice on the half-width closure of the traffic of the G205 Shanshen Line from Jiazhuang to Lusu Boundary Section

Due to the construction needs of the G205 Shanshen Line Jiazhuang to Lusu Boundary Section, in order to ensure road traffic safety and smooth construction, in accordance with the "Road Traffic Safety Law of the People's Republic of China" and the "Highway Law of the People's Republic of China", with the approval of the Tancheng County People's Government, half of the G205 Shanshen Line Jiazhuang to Lusu Boundary Section Repair Project is now closed to traffic.

1. Half-width closed road section:

The intersection of G205 Shanshen Line and Tandong Road to the G205 Lusu boundary.

桩号:K994+517-K1012+266,全长17.749公里。

2. Half-width closure time:

July 6, 2024 to November 30, 2024.

Attachment: Reminder diagram of construction section and vehicle detour

G205 Shanshen Line Road Construction Notice!

Tips: The G205 Shanshen Line has a large traffic flow, and half of the closed construction section is easy to cause traffic congestion, so it is recommended that transit vehicles detour in advance. When passing vehicles and pedestrians passing through the construction section, follow the instructions of the construction signs, slow down and pay attention to safety. We apologize for any inconvenience caused by the construction.

Notice is hereby given.

Linyi Highway Development Center, Tancheng County Center, Tancheng Brigade of Traffic Police Detachment of Linyi Public Security Bureau

July 1, 2024

G205 Shanshen Line Road Construction Notice!
G205 Shanshen Line Road Construction Notice!
G205 Shanshen Line Road Construction Notice!
2024年第1229期/总第6300期
      
本期编辑:刘 珍
      

Editor in charge: Du Zhiwu Yin Lina

Preliminary examination: Zheng Yi

Final review: Shen Yan

G205 Shanshen Line Road Construction Notice!

Read on