laitimes

Heavy! Construction of this subway line begins! Multi-line transfer......

author:Wuxi real estate small library

Good evening, good news, everyone

Line S2 is officially moving towards the civil construction stage! It's time to build!

After waiting for so long, it finally started

Check it out!

↓↓↓

Xiyi S2 line

Heavy! Construction of this subway line begins! Multi-line transfer......
Heavy! Construction of this subway line begins! Multi-line transfer......

The latest progress of the S2 line

On June 28, with the synchronous enclosure construction of the two stations of the Wuxi section of the S2 line Mashan Station and the Yixing section of the Dongjiu Square Station, the first phase of the two stations was successfully completed, and the line construction officially entered the civil construction stage!

Heavy! Construction of this subway line begins! Multi-line transfer......

Project Introduction

The Wuxi-Yixing Intercity Rail Transit Project (Line S2) has a total length of about 61.48km and a total of 9 stations, including 7 underground stations and 2 elevated stations.

The first phase of the project has a total length of 26.14km and 6 stations, including 4 underground stations and 2 elevated stations: Yixing Station, Longtan Road Station, Dongjiu Square Station, University City Station, Jingkai District Station (Yixing) and Zhoutie Station.

The total length of the second phase of the project is 35.34km, including 1.317km of elevated line, 0.51km of U-shaped groove transition section, 33.51km of underground section, and 3 stations: Mashan Station, Gedaiqiao Station and Taihu New Town Station, all of which are underground stations; In addition, there are four working wells in Zhushan Lake, Meiliang Lake West, Huzhong and Meiliang Lake.

Heavy! Construction of this subway line begins! Multi-line transfer......

Source: Wuxi Metro Online

Heavy! Construction of this subway line begins! Multi-line transfer......

Interchangeable with several subway lines

1. The line interchanges with Metro Line 1 at Gedaiqiao Station;

2. Transfer to Metro Line 6 at Taihu New Town Station.

3. The line also reserves the transfer conditions with the Suzhou-Xichang Intercity Railway and Changzhou S2 Line.

4. With the completion of Line S2, in addition to Huishan High-speed Railway Station, Wuxi Railway Station and Wuxi Bus Station (Metro Line 1 and Line 3), Wuxi East High-speed Railway Station (Metro Line 2), Wuxi New Area High-speed Railway Station (Metro Line 3), Jiangyin High-speed Railway Station (Line S1), Yixing High-speed Railway Station (Line S2), Wuxi Shuofang Airport (Metro Line 3), to achieve urban rail transit access in the region.

(Recommended reading: Are Wuxi Station and Wuxi East Railway Station the same high-speed rail station?

Heavy! Construction of this subway line begins! Multi-line transfer......

Publicity of relevant sites

At present, except for the Taihu New Town Station of Line S2, which has not been publicized before the approval of the planning and design plan of the construction project, the remaining 8 stations have been publicized.

  • Yixing Station

Located below the avenue in front of the station, it is laid along the east-west avenue in front of the station, and is designed as a two-storey underground island station, with a total construction area of 21,718.93 square meters.

  • Longtan Road Station

Located at the intersection of Longtan East Road and Dongjiu Avenue, it is laid in the north-south direction along the east side of Dongjiu Avenue, and is designed as an underground two-story island station, with a total construction area of 13,329.69 square meters.

  • Dongjiu Square Station

It is located on the east side of Dongjiu Avenue on Dongjiu Square, parallel to the north-south direction of Dongjiu Avenue. It is designed as an underground two-story island station, with a total construction area of 17,363.6 square meters.

  • University City Station

It is located at the intersection of Taihu Avenue and Xinyuan Road, and is set up from west to east at the diagonal crossing of Taihu Avenue. It is designed as a two-storey underground island station, with a total construction area of 18,025.62 square meters.

  • Jingkai District Station (Yixing)

Located on the southwest side of the intersection of Fan Li Avenue and Baihe Avenue, it is laid along the north-south direction of Fan Li Avenue, and is designed as a two-storey side station on the ground, with a total construction area of 7982.53 square meters.

  • Zhoutetsu Station

Located in the southeast quadrant of the intersection of Planning Road and Planning Zhouqian Road, it is laid in an east-west direction along the north side of the planning road, and is designed as a two-story side station on the ground, with a total construction area of 6441.45 square meters.

  • Mashan Station

Located at the intersection of Xueyun Road and Xiaguang Road, the station is designed as a two-storey underground side station, with a total construction area of about 20,874.2 square meters.

  • Gedaiqiao Station

Located on the south side of the intersection of Wanxi Road and Yuanxi Road, the station is a three-storey underground island station, which is interchange with the existing Metro Line 1 passage, with a total construction area of about 19,791.2 square meters.

(Note: The above station names are only tentative names of the project, and the standard station names should be subject to the approval and announcement of the municipal government.) )

Heavy! Construction of this subway line begins! Multi-line transfer......

摄图网ID:500614677

I'm really looking forward to it! I hope it will be built soon!

In addition, the editor reminds everyone

You can long press to identify the QR code below

Pay attention to the "Wuxi Local Treasure" public account

in the WeChat chat dialog

Reply to the keyword [S2] to get it quickly

Heavy! Construction of this subway line begins! Multi-line transfer......

In addition to this line under construction

Do you know the existing subway lines in Wuxi?

I often take the subway, but I rarely look at the line

Heavy! Construction of this subway line begins! Multi-line transfer......

Let's take a look!

There are existing subway lines in Wuxi

Heavy! Construction of this subway line begins! Multi-line transfer......
Heavy! Construction of this subway line begins! Multi-line transfer......

Guided tours

Source: Wuxi Metro Online

Heavy! Construction of this subway line begins! Multi-line transfer......

Basic fare

The fares of the Wuxi metro network are calculated according to the mileage segment.

1. 2 yuan within 5 kilometers of the start;

2. If it exceeds 5 kilometers to 15 kilometers, it will be charged 1 yuan for every 5 kilometers (less than 5 kilometers will be charged as 5 kilometers);

3. More than 15 kilometers to 29 kilometers, 1 yuan will be charged for every 7 kilometers (less than 7 kilometers will be charged as 7 kilometers);

4. More than 29 kilometers, 1 yuan will be charged for every 9 kilometers (less than 9 kilometers will be charged as 9 kilometers).

Heavy! Construction of this subway line begins! Multi-line transfer......

Wuxi subway preferential policies, crowds

Recommended reading (click on the blue word to view): Wuxi Metro Bus Free/Preferential Policy Summary!

Heavy! Construction of this subway line begins! Multi-line transfer......

Basic safety knowledge of riding

1. Please refrain from smoking, spitting, defecating, littering fruit peels, confetti, etc. in the station and carriages.

2. Please do not eat or drink in the paid area of the station or in the train.

3. Please do not play, push or run in the station and carriage.

4. It is strictly forbidden to damage light boxes, multimedia screens, wall stickers, glass stickers, billboards and other advertising facilities.

5. It is strictly forbidden to beg, scavenge, sell art, lie down, and trample on seats.

6. It is strictly forbidden to enter the track, tunnel or other areas with warning signs without authorization.

7. It is forbidden to carry items with a length of more than 1.6 meters, a weight of more than 30 kilograms, a volume of more than 0.15 cubic meters, or a sum of length, width and height of more than 1.8 meters. When the train is crowded, passengers with luggage should follow the arrangements of the staff and should not force themselves to board the train.

8. It is forbidden to bring the following items into the station:

(1) Flammable, explosive, toxic, radioactive, corrosive and other dangerous goods, such as gasoline, explosives, strong acids, strong alkalis, etc.

(2) Firearms, ammunition and controlled instruments (except those carried by special personnel such as national security, military affairs, police affairs, and customs who perform official duties with valid certificates).

(3) Animals such as livestock, poultry, pets and so on (except for assistance dogs with identification marks carried by persons with disabilities).

(4) Items with serious odor and easy to foul the facility.

(5) Fragile, sharp and other items that are not safely packaged.

9. Mentally ill, drunk, and preschool children are allowed to ride under the escort of a healthy adult.

10. If necessary, you can ask the staff for help; In case of emergency, please notify the staff immediately.

11. Correct use of safety and emergency facilities, and it is strictly forbidden to use safety or emergency devices for non-emergency situations.

Heavy! Construction of this subway line begins! Multi-line transfer......

摄图网ID:600600274

#同城##无锡##无锡头条##无锡房产##同城推荐##无锡买房#

Read on