Construction progress of the project
Biggar Ruijing Garden Phase II
Building 1# has been capped, plastering, floor heating, and ceiling are 100% completed, and the façade is ready for construction
Building 2# has been capped, plastering, floor heating, and ceiling are 100% completed, and the façade is ready for construction
Building 3# has been capped, the plastering is 80% complete, and the façade is ready for construction
Building 4# has been capped, plastering and floor heating are 100% completed, and the façade is ready for construction
Building 5# has been capped, the plastering is 100% complete, and the façade is under construction
Building 6# has been capped, plastering and floor heating are 100% completed, and the façade is under construction
Building 7# has been capped, the plastering and floor heating are 100% completed, and the façade is ready for construction
Building 8# has been capped, the plastering is 100% complete, and the façade is ready for construction
Baojia Ruijing Garden Phase III
Building 1# has been capped, the roof construction has been completed, the second masonry has been completed on floors 1-22, the installation of window frames has been completed by 90%, and the secondary piping of water and electricity has been completed by 60%
The 2# floor has been capped, the roof construction has been completed, the window frame installation has been completed by 90%, and the second masonry has been completed on floors 1-22
The 3# building has been capped, the roof construction has been completed, and the second masonry 1-26 floors have been completed
Building 4# has been capped, the roof construction has been completed, the installation of window frames has been completed by 95%, and the second masonry has been completed on floors 1-26
The 5# floor has been capped, the roof construction has been completed, and the second masonry 1-26 floors have been completed
Building 6# has been capped, the roof construction has been completed, the second masonry has been completed 1-26 floors, and the ALC board 1-26 floors have been completed
Building 7# has been capped and the roof construction has been completed
Building 8# has been capped, the roof construction has been completed, the second masonry has been completed, the window frame installation has been completed by 95%, and the secondary water and electricity piping has been completed by 50%
Building 9# has been capped and the roof construction has been completed
Project address: 200 meters west of the intersection of West First Ring Road and Wuzhen Street, Luzhou District
Tel: 400-176-0760 ext. 611238
1. Promotion and promotional materials are only used as an invitation to offer, not as an offer or commitment, and the specific rights and obligations are subject to the signed formal transaction documents.
2. We focus on sharing, remain neutral to the content and opinions stated in the text, do not provide any guarantee for its accuracy, reasonableness and completeness, and do not accept any loss or damage caused by inaccurate, unreasonable or omitted information, and we do not accept any legal responsibility for any deviation caused by the use of the information on this website.
3. The pictures are from the Internet, real pictures of the project and promotional materials, etc., due to editorial needs, there is no necessary connection between the text and the pictures, and it is for readers' reference only.
4. The copyright of all articles, pictures, audio and video files and other materials reproduced by us belongs to the copyright owner, because it is not original, the content of articles and pictures cannot be contacted by the copyright owner one by one, if the original author or editor thinks that the work is not suitable for everyone to browse, or should not be used free of charge, please contact us in time to notify us, so as to quickly take appropriate measures to avoid unnecessary economic losses to both parties.
5. Developer: Shanxi Energy Investment Baojia Real Estate Development Co., Ltd.; Pre-sale Certificate: (2021) Chang Shang Fang Pre-sale Chang Zi No. 016, (2021) Chang Shang Fang Pre-sale Chang Zi No. 036, (2022) Chang Shang Fang Pre-sale Chang Zi No. 008 (2023) Chang Shang Fang Pre-sale Chang Zi No. 002, (2023) Chang Shang Fang Pre-sale Chang Zi No. 020, (2023) Chang Shang Fang Pre-sale Chang Zi No. 050