List of major new urbanization projects in Liangping District in 2024

author:Engineering Bai Xiaosheng
List of major new urbanization projects in Liangping District in 2024
serial number The name of the project Type of investment nature of construction The start and end years of construction The main construction content and scale 2024 annual goals and tasks
total 179
1. New urbanization 54
(1) Major transportation (urban framework) 7
1 Duliang Avenue Interchange to Shuangguitang Connecting Section Government investment newly built 2024-2025 The second phase of Duliang Avenue extends to the Golden Belt, with a total of 3 kilometers and a width of 44 meters. Construction began
2 Liangping District Golden Belt Area Shuanggui Tourist Scenic Area Interchange Project (Golden Belt Interchange) Government investment newly built 2024-2025 Interchanges and connecting lines. Construction began
3 Liangping District Golden Belt Interchange Line Project (now named Liangping District Construction Renhe Interchange Link Project) Government investment newly built 2024-2025 The main line is the section from Mingyu Avenue to Maoshiyakou in the modern agricultural park, with a length of 1.102 kilometers and a roadbed width of 54 meters, and the intersection is the second phase of Duliang Avenue (roadbed width of 54 meters) and Huanhu Road (roadbed width of 47 meters), and the ramp is 1.117 kilometers long and the roadbed width is 18.75 meters. The construction content includes subgrade earthwork works, asphalt concrete pavement works, protection and drainage works, integrated pipe network works, bridge culverts and pedestrian bridges. Construction began
4 Duliang Avenue North Extension to the Second Ring Road Construction Project Government investment newly built 2024-2025 Duliang Avenue extends to Liangkai Expressway for a total of 3 kilometers, with a width of 44 meters, and is constructed to Zhuxian Road in advance. Construction began
5 New reconstruction project of the southern section of the first ring road Government investment Rehabilitation 2023-2024 The total length of roadbed, pavement, bridges, tunnels and ancillary facilities is about 5.81 km. Construction began
6 New construction of the extension of Zhuhai Avenue Government investment Early 2024-2026 The total length is about 6.6 kilometers, including one tunnel and eight bridges. Preliminary work
7 Liangping District Industrial Park Railway Special Line Project Government investment Early 2024-2025 On the outside of the existing freight yard, it is proposed to build 2 container and bulky cargo loading and unloading lines, with an effective length of 800 meters (770 meters for loading and unloading), a track laying length of 2.51 kilometers, and 3 new gantry cranes with a span of 35 meters, a new office building of 2,000 square meters and a ring road and entry and exit roads in the yard. Preliminary work
(2) Regional connectivity 8
8 Chengxuan Dalin Expressway (through Liangping) Government investment Early 2025-2027 The total length of roadbed bridges and ancillary facilities is 18 kilometers. Preliminary work
9 Long Pad Beam Fast Track (G243 Industrial Park to Huilong Section Rerouted) Government investment Early 2025-2026 The total length of roadbed, pavement bridges and ancillary facilities is 39 kilometers. Construction began
10 Liangping Baili Zhuhai to Dachuan Logistics Fast Track (Yuanyi to Hucheng) Government investment Early 2023-2025 17 kilometers of secondary roads were newly reconstructed. Preliminary work
11 XC55 Qushui Changbang Community to Fulu Datong Bridge Government investment Early 2024-2025 14 kilometers of new tertiary roads. Preliminary work
12 Liangping to Kaizhou Expressway (Liangping Section) Social investment newly built 2024-2026 The total length of roadbed, pavement bridges and ancillary facilities is 36 kilometers. Construction began
13 Liangping-Kaijiang Expressway (Liangping Section) Social investment Rehabilitation 2021-2024 The total length of roadbed pavement bridges and ancillary facilities is 45 kilometers. Completion Throw
14 Liangping to Xituo Shizhu Expressway Social investment Early 2025-2027 The total length of roadbed, pavement bridges and ancillary facilities is 48 kilometers. Preliminary work
15 Liangzhong Railway Social investment Early 2026-2028 Design speed 160 km/h, electrified, two-line, 33 km/h. Preliminary work
(3) The energy level of the new urban area has been improved 14
1. U-shaped corridor city image key display area
16 Liangping District Urban Drainage and Flood Prevention Comprehensive Treatment Project Government investment newly built 2024 1. About 65 kilometers of new urban rainwater pipe network (ditch); 2. Reconstruct about 40 kilometers of urban rainwater pipe network (ditch); 3. Dredging and dredging of rainwater pipes (ditches) for 150 kilometers; 4. Renovation of 2,600 supporting inspection wells, 5 drainage pumping stations and other facilities. Construction began
17 Shuanggui Lake Urban Drainage and Storage Capacity Improvement Project in Liangping District Government investment newly built 2024-2025 About 1,800 acres of water area of Shuanggui Lake in the urban area will be desilted, the storage capacity will be restored, and the water discharge facilities (discharge gate valves, etc.) will be upgraded to improve the storage capacity of the lake and reservoir in the urban area. Construction began
18 Rainwater pipe network renovation project in Yingbin Road area, Liangping District Government investment newly built 2024 1. Transform 9 kilometers of rainwater pipe network along the Yingbin Road area; 2. Renovation of supporting rainwater inspection wells and 220 rainwater outlets and other facilities; 3. Dredging and dredging rainwater pipes (ditches) for 5 kilometers. Construction began
19 Construction of digital characteristic applications in Liangping District Government investment newly built 2024-2025 1. Focusing on Shuanggui Lake and High-tech Zone, build Mingyueshan Liangpin AI big data platform; 2. Iteratively upgrade the information sharing platform of "Building Mingyue Mountain" (Zhihui Duliang City Unified APP); 3. Develop and construct characteristic applications such as "One Account for Rural Industry" and "One Network for Digital and Intelligent Villages" in 33 towns and streets in the region in phases and steps; 4. Create digital scene applications and optimize the functions of prefabricated food live broadcast centers. 5. Smart urban management (phase II) project. Construction began
20 Liangping District International Wetland City Green Development Pilot Demonstration Project Government investment newly built 2024-2025 1. Repair 8 kilometers of the main pipe of Zhangxingqiao River, and complete 3 kilometers of blank pipe network in the high-tech zone. 2. Construct a sewage treatment station and a supporting sewage pipe network of 3 kilometers for a prefabricated vegetable production base, and green about 20,000 square meters. Construction began
21 Liangping affordable housing project Government investment newly built 2024-2025 500 affordable housing units will be built, with a total area of about 45,000 square meters, with an average area of 90 square meters, and 200 units of 18,000 square meters will be built in the first phase. Preliminary work
22 Vocational Education Center Xincheng Campus Government investment Rehabilitation 2023-2024 The campus is planned to cover an area of 383 acres, with a proposed construction area of about 160,000 square meters, 130 new teaching buildings, and a total of 14 buildings. The main body is completed
23 Duliang Grand Theatre Government investment Rehabilitation 2022-2024 main engineering and interior and exterior decoration, mechanical and electrical equipment installation, landscape engineering; Construction area: 26,000 square meters. 85% of the total amount of work completed
24 Duliang New Economy Industrial Park Government investment Rehabilitation 2023-2025 Housing civil engineering, outdoor decoration engineering, greening landscape engineering, comprehensive pipeline engineering, municipal engineering, etc., with a construction area of 49,800 square meters. The main body is completed
25 Liangzhong District Urban Renewal and Upgrading Project Government investment Early 2024-2026 Improve public services and supporting facilities in the Liangzhong area, retain, renovate, demolish and increase the implementation of the renovation of old rental blocks, promote the optimization and upgrading of urban space, and improve the living environment. Preliminary work
26 Real estate development Social investment newly built 2023-2025 Real estate development of 700,000 square meters. About 200,000 square meters were completed and delivered
27 Liangping District "International Wetland City" Ecological Protection and Green Development EOD Project Social investment newly built 2024-2026 1. Wetland ecosystem protection and governance projects; 2. Liangping Chiniucheng Cultural Experience Center; 3. Liangping International Ecological Health Care Center; 4. Liangping High-tech Zone Prefabricated Vegetable Industrial Park; 5. Liangping Ecological Civilization Education Green Camp. Construction began
28 Liangping Sewage Treatment Plant Phase III Expansion Project Social investment newly built 2024-2025 Expand the sewage treatment plant with a treatment capacity of 30,000 cubic meters per day. Construction began
29 Liangping District has an annual water pollution treatment project of 700,000 tons Social investment Early 2025-2026 Covering an area of 7,000 square meters, it will build new workshops, laboratories and management rooms and other infrastructure. It has formed an annual treatment capacity of 600,000 tons of industrial wastewater and 100,000 tons of sludge. Pre-completion period
(4) Create a livable and high-quality old city 14
30 Liangping District 2023 old community renovation project Government investment newly built 2024 1. The renovation area is 401,200 square meters, involving 20 communities, 315 buildings, and 6,585 residents. 2. 13.2 kilometers of old gas pipeline network renovation, 11.5 kilometers of drainage facilities, 5.6 kilometers of old power facilities, 23 kilometers of weak current line renovation, more than 300 septic tank cleaning, 60,000 square meters of hard pavement and greening renovation, 1.2 kilometers of dilapidated fence removal, more than 1,800 additional public lighting, 60,000 square meters of fire protection facilities, more than 200 cultural, sports and health facilities for the elderly and children, 30 barrier-free facilities, 92,000 square meters of exterior wall renovation, etc. Completion Throw
31 Urban Village Reconstruction Project in West Street Area Government investment newly built 2024-2026 After expropriating the collective land in the West Street area of Liangping District, demolishing dilapidated houses, compensating and relocating residents and enterprises, the site will be leveled, new resettlement houses will be built, and supporting infrastructure such as municipal roads will be constructed. The total area of the project is 675218 square meters, the construction area is 365008 square meters, the number of resettled households is 1,337, and the number of resettled people is 3,298, all of which are resettled in kind; 170,560 square meters of new resettlement houses are planned; The land is leveled 472653 square meters, and 4.79 kilometers of municipal roads and pipe networks are built. Complete the land bank
32 West Street Cultural and Leisure Block Demonstration Project (Phase I) Government investment newly built 2024-2026 Demolish some dilapidated houses, create a time-themed scene block on West Street, build parking lots, renovate old residences, and restore public spaces along the Baisha River. Construction began
33 Liangping District 2024 old community renovation project Government investment newly built 2024-2025 The renovation area is 102,500 square meters, involving 8 communities, 43 buildings, and 989 residents. Construction began
34 Liangping District Urban Expansion Municipal Water Supply Network Project Government investment newly built 2024-2028 About 51 kilometers of new municipal water supply pipe network will be built in the new city expansion area; 28 kilometers of new municipal water supply pipe network were built in the old city expansion area. Construction began
35 In 2024, the aging and renovation of urban gas pipelines will be renovated Government investment newly built 2024-2025 Hexing, Liangshan, Shuanggui, Renxian, Jindai and other streets gas, water supply and other pipelines aging and renovation. Construction began
36 Chongqing Liangping District Public Water Supply Network Leakage Control Project Government investment newly built 2024-2025 Renovation and construction of 32.9 kilometers of municipal water supply pipe network, pipe diameter DN100-DN500, new DMA five-level zonal metering system, new water supply network pressure control system, new GIS geographic information system, process data collection and scheduling SCADA system and other intelligent systems. Construction began
37 Liangping District Center Nursing Home Construction Project Government investment newly built 2024 Construction area of 19,395.6 square meters: the construction of 2 district center nursing homes, the plan to build 450 new nursing beds, complete the configuration of relevant facilities and equipment, and focus on supporting the extremely poor people in the whole district. The main body is completed
38 Reconstruction and expansion project of Dongmen Pension Service Center Government investment newly built 2023-2024 The construction area is 5,422 square meters, and 128 nursing beds are planned. Configure and improve rehabilitation care and age-appropriate facilities and equipment, and transform and improve fire safety capabilities. The main body is completed
39 Shimashan-Luohan Hill Park Block Renewal Project (Phase I) Government investment newly built 2024-2026 Reconstruction and expansion of Shimashan-Luohan Mountain Park and surrounding supporting facilities. Construction began
40 Renovation of dilapidated urban houses in Liangping District Government investment newly built 2024 111 urban dilapidated houses were renovated (shantytown reform). Construction began
41 In 2023, the aging and renovation of urban gas pipelines will be renovated Government investment Rehabilitation 2023-2024 Liangshan, Shuanggui, Renxian, Jindai and other streets gas, drainage, water supply and other pipelines aging and renovation. Completion Throw
42 Urban renewal and upgrading project of Shizhuping area of Jindai Street Government investment Early 2024-2026 Complement the functions of public space, improve public facilities and other facilities in the block; Demolish some of the dilapidated buildings, renovate the old houses, improve the style of the old neighborhoods, and create important spatial nodes. Preliminary work
43 Liangshan Street Urban Village Reconstruction Project in Liangping District (Medium and Long-term) Government investment Early 2025-2026 1,261 houses in the urban village of Liangshan Street were requisitioned and demolished, with a construction area of 345,000 square meters, 11.8 kilometers of new connecting roads, about 10 kilometers of pipe network renovation and 1,090,900 square meters of environmental remediation. Construction began
(5) Create a "small county and big city demonstration area" 11
44 Liangping District Forest Health Care Base Construction Project Government investment newly built 2023-2026 In Shuanggui Lake Wetland Park, Gujia Temple, Anning Elderly Care Center, and Chenjia Courtyard will build forest health care bases, and improve the construction of related supporting facilities. Construction began
45 Guihu Kindergarten in Liangping District Government investment newly built 2024-2025 With a construction area of 15,000 square meters, it is planned to cover an area of 40 acres, and 24 preschool teaching classes and related supporting facilities will be built. Construction began
46 Shuanggui Primary School was renovated and expanded Government investment newly built 2024-2025 The reconstruction and expansion of Shuanggui Primary School covers an area of 43 acres, and plans to add 36 classes, with a new construction area of about 13,000 square meters. Construction began
47 Liangping District Fude Primary School Expansion Project Government investment newly built 2024-2026 The construction area is about 13,000 square meters, covering an area of about 20 acres, and 24 teaching classes and related supporting facilities have been built. Construction began
48 The second phase of the construction project of Liangping District Traditional Chinese Medicine Hospital Government investment newly built 2023-2025 The land converted from shantytowns will be used to build a logistics support center, a fever clinic and a traditional Chinese medicine cultural park. 50% of the completed work quantity
49 Infrastructure Improvement Project for Residents Relocation and Resettlement Area of Independent Industrial and Mining Area in Liangping District Government investment newly built 2024 Pingjin Town, Huilong Town, Hucheng Town, independent industrial and mining area residents to avoid danger and resettlement, residents to relocate and resettle the environment of the resettlement area, sewage pipe network transformation, new community service centers, special development of industrial park infrastructure, etc. The main body is completed
50 Pingjin Town, Liangping District, Fuping Town, public welfare burial facilities Government investment newly built 2024-2025 The total area is about 150 acres, and the main construction content is civil engineering and supporting facilities. 80% of the work volume completed
51 Chongqing Liangping District Longxiangsi Reservoir Longtan Primary School Relocation Project Government investment Rehabilitation 2023-2024 The total construction area is about 4,017 square meters, covering an area of 12 acres, including new teaching buildings, comprehensive buildings, sports fields and living rooms. Completion Throw
52 Construction of funeral parlor in Liangping District Government investment Rehabilitation 2023-2025 The funeral parlor in the new district was built, the mourning hall and cremation workshop were improved, 6 high-end cremation furnaces were supported, and related facilities and equipment were improved. Construction began
53 The function of the town has been improved Government investment Early 2024-2027 Sidewalk upgrading and remediation, oiling of roads in towns and towns, landscape transformation, etc. Preliminary work
54 Wetland health care on the east bank of Shuanggui Lake Social investment newly built 2024-2026 According to the overall planning of Shuanggui Lake Wetland Park, the old residential land on the east bank of Shuanggui Lake and other construction land should be reasonably used to build a Shuanggui Lake wetland health care base and explore the realization of the value of the wetland industry. Preliminary work such as investment attraction was initiated