What is the difference between a whole house and a half pack? How long does the project take? Say it all at once!

author:Love space quality outfit

With the increasing acceptance of whole-house decoration, owners in first-tier cities and other cities will consider whole-house decoration when decorating their houses.

Compared with the traditional decoration method in the past, the whole house has the advantage of worry-free and time-saving one-stop bag check-in, but many people still can't tell the difference between it and semi-packaged repair? is also entangled in the construction period of the whole house, today Xiao Ai will tell you about the system.

What is the difference between a whole house and a half pack? How long does the project take? Say it all at once!

The difference between the whole house and the semi-package

1. The decoration form and content are different

The whole house is fully furnished

The whole house decoration can be narrowly understood as a one-stop full-package repair, integrating decoration material selection, construction, soft decoration design and installation, custom furniture design and installation, and pre-occupancy cleaning and other projects, which can basically allow the owner to move in.

The owner only needs to buy basic household appliances, as well as his favorite decorations or other small objects, which is relatively more worry-free and labor-saving for the whole house.

Semi-packaged repairs

Semi-packaged repairs are different from whole-house decoration in terms of decoration process and content. Generally, the owner is responsible for the purchase of main materials, and the decoration company or construction team is responsible for the construction and the procurement of auxiliary materials, including basic construction, such as water and electricity, bricklayers, carpentry, painting, etc.

The owner is not only responsible for purchasing the main materials, such as flooring, sanitary ware, tiles, etc., but also staring at the construction site, which will take more time and energy.

What is the difference between a whole house and a half pack? How long does the project take? Say it all at once!

2. The style and decoration budget are different

The whole house is fully furnished

It can ensure the unity of the decoration style and color matching of the whole house, and enhance the overall sense and coordination of the interior space.

Because there is a professional team responsible for the design and construction, the communication and coordination work of the owner is reduced, and it is more worry-free for the busy owner, but the overall price is expensive, and the premise of worry-free, trouble-saving and labor-saving is that the budget is relatively sufficient.

Semi-packaged repairs

If the owner himself wants to have more personalized decoration services, half package can be personalized according to needs and preferences.

Since the owners buy some materials and accessories themselves, they can also control the decoration budget, the price will be slightly lower, and the price of semi-packaged repairs is generally between 500-800 yuan / square meter, of course, different cities or regions are different, and the gap between different materials will be greater.

Owners have a high degree of freedom and a wide variety of choices, but at the same time it takes a lot of time and effort, which is suitable for owners who have time and a certain amount of expertise.

What is the difference between a whole house and a half pack? How long does the project take? Say it all at once!

How long is the whole house renovation period?

It may take 1-2 weeks for the whole house to be renovated from the communication and confirmation of the design plan in the early stage to the selection of materials. When the main construction begins, there is basically a definite construction period for different phases.

Of course, different house areas, different decoration styles, and different construction periods, the following Xiaoai will give you a general reference.

✅ Demolition works: The demolition of small and medium-sized apartments generally takes 1-2 days.

✅ Hydropower renovation: Due to the different sizes of the house and the complexity of the hydropower lines, the time is long and short, and it generally takes 4-10 days.

✅ Waterproofing project: Bathroom, kitchen and other areas need to be waterproofed, it will take about 3-7 days, if you add a porch or balcony, you need to leave more time.

✅ Bricklayer (tiling, etc.): The area of the house is different, the space for using tiles is different, and the time is different, and it takes about 10 days for small and medium-sized apartments.

✅ Carpentry: 15-20 days for ceilings, partitions, custom cabinets, etc., and an additional 5-10 days for finishes and closings, and it may take longer if you make custom furniture.

✅ Painter: Paint work on walls and woodwork, which takes about 10-15 days.

What is the difference between a whole house and a half pack? How long does the project take? Say it all at once!

Xiao Ai suggests:

If you want a more certain construction period for the whole house, you can consult a professional decoration company, and some renovation companies will make a commitment to the construction period according to the specific needs of the owner, but it is necessary to remind everyone that the construction period of the new house is different from the old house, and it takes more time to renovate or reinstall the old house.

It is recommended that you consult the construction process and specific time of the whole house, if you can write the whole house construction period into the contract, and indicate that the delay will be compensated, it is more reassuring and more reliable for the owner.