laitimes

The city's flood control and disaster relief video dispatch meeting was held Zhang Zuolin attended and spoke

author:This is Ningxiang
The city's flood control and disaster relief video dispatch meeting was held Zhang Zuolin attended and spoke

The city's flood control and disaster relief video dispatch meeting was held

Zhang Zuolin attended and spoke

Actively respond to a new round of heavy rainfall

Make every effort to ensure a safe flood

In order to prevent and respond to a new round of heavy rainfall, on the evening of July 1, the city held a video dispatch meeting for flood control and disaster relief. Zhang Zuolin, Secretary of the Municipal Party Committee, attended and delivered a speech; Huang Tao, deputy secretary of the municipal party committee and mayor, presided over the meeting; City leaders Li Lei, Sun Yong and Yang Can attended the meeting.

The city's flood control and disaster relief video dispatch meeting was held Zhang Zuolin attended and spoke

In the city's emergency command center, the participants stared at the rainfall map on the big screen, always paid attention to the rainfall in all parts of the city, the water level of major rivers and reservoirs, and checked the flood control and disaster relief personnel on duty. The meeting listened to the analysis of the rain and water situation in various towns (streets), as well as the report on the development of flood prevention and disaster relief, and arranged and deployed the city's flood prevention and disaster relief work. That night, the city's flood control and disaster relief teams at all levels waited for a new round of heavy rain. It is reported that since the beginning of the flood season, the city has ushered in continuous heavy rainfall weather, and the whole city has made concerted efforts to fight the "active battle" of flood control to ensure the safety of people's lives and property and the overall stability of society.

The city's flood control and disaster relief video dispatch meeting was held Zhang Zuolin attended and spoke

The meeting emphasized that all departments at all levels in the city should maintain a high degree of vigilance, pay close attention to meteorological changes, scientifically study and judge the rain and water conditions, compact work responsibilities, strictly implement the leadership and 24-hour duty system, and actively respond to a new round of heavy rainfall; It is necessary to strictly implement flood prevention and disaster relief measures, strictly prevent mountain floods and geological disasters and mountain ponds and reservoirs, resolutely and resolutely do a good job in transferring and avoiding risks, find out the situation of scattered support for the five guarantee households, transfer and resettle the vulnerable people in place, so that they should be transferred to the fullest, should be transferred, no one is left behind, no one is missed, and comprehensive investigation and control of flood control risk points to ensure that the risk is not lifted and personnel do not return; It is necessary to increase the intensity of patrolling the embankment to investigate and deal with dangers, increase the strength of personnel, prepare sufficient equipment and materials, and ensure that the danger is detected, reported and dealt with as soon as possible; It is necessary to scientifically and accurately dispatch reservoirs and ponds, strengthen the overall planning and dispatch of reservoirs, sluices, pumping stations, and other water conservancy facilities, and go all out to ensure the safety of flooding.

The city's flood control and disaster relief video dispatch meeting was held Zhang Zuolin attended and spoke

After the meeting, Zhang Zuolin successively went to the outlets along the city and the low-lying areas prone to water accumulation to check the implementation of the prevention and response to urban waterlogging on the spot, and communicated face-to-face with the relevant person in charge. Zhang Zuolin stressed that it is necessary to be strictly on duty, actively prevent and deal with them, strengthen the investigation of risks and hidden dangers during the flood season, and deal with dangerous situations and problems in a timely manner to ensure the safety of the people's lives and property. In particular, it is necessary to do a good job in the disposal of water accumulation in low-lying areas and roads in the city, strengthen personnel strength, allocate sufficient materials and equipment such as waterproof baffles, strengthen road inspections and traffic diversion, and take road closure measures in a timely manner on waterlogged sections of roads underneath, and transfer personnel and vehicles in advance to ensure that large-scale waterlogging does not occur.

The city's flood control and disaster relief video dispatch meeting was held Zhang Zuolin attended and spoke

(Duty Leader: Yu Bo Review: Min Taotao Coordinator: Liu Shijiang Proofreader: Lu Yinglong, Yi Hehua Reporter: Li Xianqiang, Li Yichao, Peng Feng Editor: Liu Xin)

Read on