laitimes

China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.

China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.

China Railway Xingchuang Yijing-Fangjia [14 times] visited the house to broadcast the construction progress, update the construction progress of the community, want to know more about the progress, and consult the members of the house visit team.

At the request of fans, I want to take a look at the recent construction progress, and the members of the house exploration team entrusted by the owner arranged to step on the plate, took some pictures of the construction progress of the community, and shared it with you.

In order to facilitate communication, the owner exchange group has been established to help find neighbors, and the owners who buy (China Railway Xingchuang Yijing) can send me a private message, private message content: There is a house to have a home, and the private message automatic reply content is the way to join, the benefits of the fans, the construction progress of the community is updated from time to time, and the public welfare house inspection is not easy, and everyone is welcome to like and share and forward.

China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.

★ Hello owners and friends, the platform is committed to outputting high-quality, real content of the report, with a fair and just objective perspective, to bring you the most intuitive construction site situation.

★ Our content covers: construction site real shot, house type measurement, house type VR, park real video, etc., so that owners can understand the construction progress of their own real estate in real time.

This time, we came to the Xingchuang Yijing plot, and the time for stepping on the plate was around 4 o'clock in the afternoon, and you can take a look at the construction of the building. This is the 14th time that the Fang family has stepped on the construction site, and let's take a look at our harvest this time.

★ This article covers:

◆ Outdoor construction progress

[Building façade + on-site situation + video]

◆ Surrounding environment

Property Introduction

China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.

Aerial view

China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.

As of April 8, according to the statistics of the editor, in 2022, a total of 326 residential units have been contracted, and the average price of online signing is about 52,000 yuan per square meter.

[Floor area ratio] 2.5

【Greening rate】30%

Total number of households: 1,144

【Parking spaces】A total of 1,373 parking spaces

【Floor area】46,389.09 square meters

[construction area] 189,989.62 square meters

【Building type】slab floor, low-rise, multi-storey, small high-rise

Total number of buildings: 19

[property right period] 70 years

【户型】78㎡、95㎡、98㎡、115㎡、134㎡

【Building address】The southwest corner of the intersection of Fuhai Road and Guangmao Street in Huangcun, the west side of Fuhai Jiayuan Community

Outdoor construction progress

[Building façade + on-site situation + video]

China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.

Some of the buildings have been marked with building numbers, we refer to the construction process, you can see that the façade of the building is still in the secondary construction stage, and there is a hanging basket platform in front of the building.

China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.

At present, the building is in the secondary construction of the façade, and the workers are working on the gondola platform, and it can be seen that the glass of a few buildings is still not installed. At the same time, the ground is also under construction, and some locations are also beginning to be greened, and you can see that the whole is changing now.

Surroundings

China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.
China Railway Xingchuang Yijing-Fangjia [14 times] stepped on the field to broadcast the construction progress.

Real photos of the surrounding environment signs and bus stops.

★ Statement: Fangjia only uses a third-party perspective to make a true and objective report on the construction progress of the owner's visit to the community. Note: The building number is judged by the little brother according to the distribution of the real estate, if there is something wrong, please send a private message to correct;

★ The above is the content sharing of this stepping on the plate, it is not easy to step on the plate, your reading and sharing and forwarding is the greatest encouragement to the Fang family.

That's the end of today's content, for more exciting content, please follow my headline account.

Read on