laitimes

When you fall asleep to the sound of rain, someone is fighting all night! Walk into the "central nervous system" of the Guichi flood control battlefield

author:Treasure land and precious pool

Since the beginning of the plum

Guichi ushered in continuous heavy rainfall

The water level of the Yangtze River, inland rivers and reservoirs in the territory continues to rise

Our district has successively launched four-level and three-level emergency response

It serves as the center and brain of flood control dispatch and command in the whole region

Guichi District Flood Control and Drought Relief Headquarters

Race against the rain and race against the water

Real-time monitoring and high-speed operation

Firmly build a "safety embankment" during the flood season

When you fall asleep to the sound of rain, someone is fighting all night! Walk into the "central nervous system" of the Guichi flood control battlefield

At 7 o'clock in the morning of June 27, the Guichi District Flood Control and Drought Relief Headquarters was already a busy scene. The tapping sound of the keyboard is mixed with the ringing of the telephone, and the main leaders of the flood control headquarters and the heads of several member units are conducting daily meetings and judgments in the centralized office, "it is expected that heavy rain will be heavy on the 27th, and moderate to heavy rain on the 28th...... Zhang Mingming, head of the forecast and early warning team and director of the district meteorological bureau, is reporting the latest rain monitoring to everyone.

In recent times, there has been a high level of tension here. Since the four-level emergency response was launched on June 20, day and night, and all-out efforts, it is a true portrayal of every front-line staff member of the district flood control and drought relief headquarters. After entering the plum season, our district has fully entered the state of flood prevention, flood resistance, and disaster relief, and the district defense refers to the dispatch of elite soldiers and strong generals from all member units to form 7 special work teams, centralized office, 24-hour duty, and the establishment of a "wartime center" for flood control and flood control in the whole region, giving full play to the functional role of taking the lead in grasping the general, and real-time scientific scheduling. The leaders of the headquarters are to sit in front of the defense office and organize all relevant departments to send personnel to work at the site to ensure that all decisions and deployments are communicated and implemented in a timely manner.

Now is the critical period of flood control, the collection of real-time data, the transmission of important instructions, and the deployment of flood control materials...... All kinds of routine work are concentrated in the office of the district flood control and drought relief headquarters. In order to respond to every instruction and every message, the nerves of the staff here are in a tense state 24 hours a day, and the mobile phones never leave their bodies, always paying close attention to the flood control work. At present, the district flood control and drought control headquarters has a rolling forecast of water, rain and flood information once a day for two hours, and in combination with daily consultation, research and judgment, it timely compiles and distributes the "Flood Prevention and Consultation Special Report", "Flood Prevention and Response Special Report", "Flood Prevention and Drought Relief Briefing", etc., so as to make multiple reports a day and report on urgent matters.

When you fall asleep to the sound of rain, someone is fighting all night! Walk into the "central nervous system" of the Guichi flood control battlefield
When you fall asleep to the sound of rain, someone is fighting all night! Walk into the "central nervous system" of the Guichi flood control battlefield

As the "commander" of flood control in the whole region, since June 20, the supervision group led by the main persons in charge of the district's emergency, water conservancy, self-regulation, transportation, housing and construction departments has sunk to the front line of the southern mountainous areas, low-lying waterlogging points, cliffs and waterfront sections, etc., focusing on supervising the implementation of key flood control sections. On June 21, the supervision team found that the demolition of a bridge construction channel was not complete, partially blocking the flow of river water; On June 22, it was found that the avoidance measures for some of the collapsed places were not perfect; On June 25, it was found that the sewer manhole covers of individual residential areas in the main urban area were sealed...... Through the front-line supervision that does not leave dead ends, a dangerous and hidden danger is discovered in a timely manner, summarized to the district prevention index to form a list of problems, and follows the "commander" issued by the "commander" to issue rounds of early warning reminders, rain weather, flash flood disaster risk and other defense information, and timely "call" to the towns and streets, the responsible subjects to rectify within a time limit. At present, the district prevention refers to the issuance of two phases of supervision and follow-up supervision and follow-up rectification, a total of 68 investigators were dispatched, and 15 hidden dangers were found.

As the "warning" of the safety risks in the flood season in the whole region, the district prevention refers not only to prevent the "flood beast", but also to discover all the flood season risks in advance. In the past few days, our district has reviewed the situation, made scientific decisions, and closed or stopped all scenic spots, wading projects under construction, construction sites and ferries in the region in advance; equipping the streets of key flood control towns in the southern mountainous areas with satellite phones; Supervise and urge non-coal mining, chemical, industrial and trade enterprises to make flood prevention plans in a timely manner and implement flood prevention responsibility systems; Remind chemical enterprises to be proficient in the dangerous characteristics and emergency measures of hazardous chemicals that react when exposed to water, and implement waterproof, moisture-proof and explosion-proof measures for key parts such as high-temperature molten metal and aluminum-magnesium metal dust...... Through meticulous investigation and multi-department linkage, we will pay close attention to various safety measures during the flood season with a sense of responsibility of "always rest assured".

When you fall asleep to the sound of rain, someone is fighting all night! Walk into the "central nervous system" of the Guichi flood control battlefield

As of 8 a.m. on June 27, the water level of Chikou Station on the Yangtze River was 13.64 meters, which had exceeded the water level (13.60 meters) by 0.04 meters. The person in charge of the district defense command said that he will continue to maintain a "tight" work state, carry forward the style of continuous combat, grit his teeth, go all out, and continue to build a solid line of defense for safe flooding. It is understood that at present, the whole region flood prevention and rescue materials are fully prepared, all towns and streets and local enterprises have signed social materials and material support agreements, according to the actual situation of flood control, each key area or embankment has been pre-set sand, stone and other flood control materials. At the same time, the district has implemented 245 emergency rescue teams with more than 5,719 people, and more than 180 people from the Chizhou Shuguang Rescue Team and the Chizhou Blue Sky Rescue Team, which are social welfare organizations, have been included in the emergency rescue system of our district to ensure that they can rush to the scene for rescue support at the first time at critical moments.