Due to the needs of road rehabilitation construction on the east bank of Baotong Bridge of G325 Qinjiang Bridge, in accordance with the relevant provisions of the Road Traffic Safety Law of the People's Republic of China and the implementing regulations, it is hereby decided to implement traffic restriction measures on the east bank section of Baotong Bridge of G325 Qinjiang Bridge, and the specific notice is as follows:
1. The time of traffic restriction measures
From 2 August to 13 August 2024, traffic restrictions may be extended in the event of inclement weather or emergencies.
2. Traffic restriction measures
G325钦江大桥保通桥东岸路段(K0+825至K0+885段)。
3. Traffic restrictions
Half of the road closure construction will be implemented on the east bank of the Baotong Bridge of the G325 Qinjiang Bridge, and vehicles will pass alternately.
Fourth, the detour route
(1) Car: Qinzhou Bay Avenue - Wuqiao Baotong Bridge - Penglai North Avenue - G325 line;
(2) Big car: G325 line - Jiuda Highway - Qinling Highway;
(3) Two-wheeled vehicles and tricycles: pass according to the original road.
Drivers of vehicles passing through restricted traffic areas are requested to follow the instructions of traffic signs and markings, pay attention to slowing down or detouring, and obey the command and guidance of on-site traffic management personnel. We ask for your understanding for the inconvenience caused by the implementation of traffic restrictions.
Notice is hereby given.
Attachment: Schematic diagram of the detour route
China Aneng Group First Engineering Bureau Co., Ltd
Traffic Police Detachment of Qinzhou Public Security Bureau
Figure 1 on July 30, 2024: Location map of road construction
Figure 2: Schematic diagram of the trolley detour route
Figure 3: Schematic diagram of the detour route of the large vehicle
Source丨Traffic Police Detachment of Qinzhou Public Security Bureau
Editor丨Liang Wenhui
Proofreading丨Huang Yukun
Audit丨Luo Libin
❀ Shhhhh Listen, a hundred birds chirp
❀ NEW! Guangxi has raised the basic pension of retirees, and the calculation method is →
❀ The construction of the new bridge of Vinh Phuc Bridge is progressing steadily
❀ Traditional Village丨Su Village is picturesque
❀ Traditional Village丨Huapingling Village is very interesting