China News (Zhang Debing, Zhang Shiqi, Zhang Lingfeng) A few days ago, several trucks carrying soybean meal set off from Hebei Jiahao Grain and Oil Co., Ltd. in Cangzhou Bohai New Area and rushed to several factories of Wen's Group in Cangzhou, and Wen's urgent need for these raw materials for processing feed. During the epidemic prevention and control period, Hebei Jiahao Grain and Oil has taken active countermeasures to ensure the normal production of Wen's, and has ensured the supply of raw materials for about 5,000 tons of soybean meal in Wen's since the Spring Festival.
Hebei Jiahao Grain and Oil Co., Ltd. is a wholly foreign-owned enterprise in Cangzhou Bohai New Area, mainly producing and operating edible soybean oil and soybean meal for feed. "As a provincial key people's livelihood supply enterprise, the more we are during the epidemic period, the more we must tap our potential, overcome difficulties, and produce at full capacity to ensure market supply." According to the relevant person in charge of Hebei Jiahao Grain and Oil Co., Ltd., they set up a leading group for epidemic prevention and control at the first time, formulated a detailed and feasible emergency plan and deployed it in a timely manner. At the same time, emergency deployment of prevention and control materials to meet production needs. According to reports, since the Spring Festival, Hebei Jiahao Grain and Oil Co., Ltd. has supplied a total of 230,000 tons of soybean meal to the whole country.
On January 30, the Ministry of Agriculture and Rural Affairs, the Ministry of Transport and the Ministry of Public Security jointly issued a document requiring feed production enterprises in various places to accelerate the recovery of production, meet the demand for livestock and poultry breeding feed, increase the effective supply of livestock and poultry products, and make every effort to ensure the stable production of agricultural products. After receiving the documents, the company immediately sent soybean meal to feed mills and farmers in various places to ensure supply, but new problems emerged, labor labor was seriously insufficient, and a large influx of transport trucks caused personnel to gather, and the difficulty of effective prevention and control management increased sharply. In terms of labor personnel, it is difficult for non-local personnel to return, and the local labor service personnel are called back to the factory as much as possible after understanding their recent contact history and physical condition, but compared with daily production, there is still a shortage of people, and the company optimizes the integration of post ratios to make up for the shortage of people; in terms of transport vehicles, a series of epidemic prevention requirements and measures for the delivery of goods during the epidemic period of vehicles have been added, and the vehicles before arriving at the factory are informed of the company's various prevention and control protection requirements through WeChat, mail, fax and other means, and vehicles that do not meet the requirements refuse to enter the factory to pick up the goods.
The development of epidemic prevention is not wrong, and the project does not stop. The second-phase expansion project of Hebei Jiahao Grain and Oil Co., Ltd. pressed the "fast-forward button", and the expansion project has a production capacity of 1.65 million tons / year soybean processing and 330,000 tons of vegetable oil refining. After the completion of the project expansion, Hebei Jiahao Grains and Oils will become the largest production capacity of Cargill in China, and will also become one of the largest factories in the same industry in China.
The second phase expansion project of Hebei Jiahao Grain and Oil is a key project of Hebei Province in 2020. During the epidemic prevention and control period, the vacuum pre-compression work of the on-site land of the second phase of the project continued to advance, and the on-site construction personnel were closed management, and the construction enterprise prohibited the addition of on-site construction personnel and the shift personnel from coming to the new area during the epidemic prevention period; and the smooth progress of the project was ensured by taking overtime work and other methods for on-site construction personnel. At the same time, in order to ensure that the design progress is completed as scheduled, the project team and the design institute personnel use online office software to ensure that the construction drawings are delivered on schedule through online technical discussions and other measures, which not only reduces the gathering of personnel during the prevention and control period of the project, but also creates conditions for the project to start fully after the epidemic.
Editor-in-Charge: Ni Hongliang