laitimes

16 pontoon bridges in the Jinan section of the Yellow River have been opened to traffic, and the Level IV emergency response of the Yellow River Flood and Drought Disaster Defense has been lifted

On October 27, the water flow of the Yellow River Luokou Station fell back to 1990 cubic meters per second, and the Luokou Pontoon Bridge resumed operation at 12 noon. 17 pontoon bridges in Jinan have been connected to 16 (Yujiang, Zhongxin, Zhongchuan Hengxin, Jinjin, Yanli, Gu Lou, Qi Changmatou, Friendship, Ping'an, Jibei, Dongjiao, Dongcheng, Hujia'an, Jizhang, Jizou, Luokou), and 1 has not been opened to traffic (Dongda).

On October 26, in view of the current stabilization of the flood control situation of the Yellow River in Shandong, the Shandong River Affairs Bureau decided after research to lift the level IV emergency response of the Shandong Yellow River Flood and Drought Disaster Prevention from 12 o'clock on October 26. It is reported that in this autumn flood, the maximum flow of Aishan Station, the main stream of the Yellow River in Shandong Province, is 5370 cubic meters per second, and the maximum flow of Lijin Station is 5240 cubic meters per second, which is the most serious autumn flood since 1985 and the largest flood since 1988; the highest water level of Dongping Lake is 42.47 meters, and the super alert water level is 0.75 meters, which is the highest water level since 2001; the maximum flow of the Jindi River is 280 cubic meters per second, which is the largest value since 2010.

16 pontoon bridges in the Jinan section of the Yellow River have been opened to traffic, and the Level IV emergency response of the Yellow River Flood and Drought Disaster Defense has been lifted

The Shandong Yellow River Bureau launched the Shandong Yellow River Flood and Drought Disaster Prevention Level IV emergency response at 10 o'clock on September 20, and upgraded the level IV emergency response to level III at 10 o'clock on September 21. River affairs departments at all levels anchored the defensive goal of "no floodplains in the beach area, no dam collapse in the project, no mutation in the river situation, and no casualties in the river", strengthened the measures of "forecasting, early warning, rehearsal, and plan", strengthened accurate dispatch, and made every effort to strictly prevent and defend, ensuring the flood prevention safety of the Yellow River in Shandong. With the reduction of the flow of the main stream of the Yellow River, the water level of Dongping Lake fell below the alert water level, since 8 o'clock on October 24, the emergency response of the Flood and Drought Disaster Defense of the Yellow River in Shandong was lowered from Level III to Level IV., and then the main stream of the Yellow River in Shandong was reduced to the flow level of 2000. Due to the long duration of the autumn flood and the great impact on the flood control project, the Yellow River Affairs Bureau of Shandong will pay close attention to the rain and changes in the work conditions, strengthen the inspection and duty of the project, and do a good job in the aftermath of the flood to ensure the safety of flood prevention.

Transferred from: Jinan Times

Source: Lu.com

Read on