laitimes

Always ready! Dezhou Municipal Facilities Service Center is fully staffed

author:Qilu one point

Qilu Evening News Qilu one-point reporter Wang Jingang

On July 28, typhoon "fireworks" entered Dezhou City, and the Dezhou Municipal Facilities Service Center attached great importance to it, and at 18:00 on the evening of the 28th, it urgently launched the city's flood prevention first-level combat readiness, and more than 300 flood prevention personnel and more than 150 flood control and extraction equipment were on standby all night to make sufficient ideological preparations and operational preparations for the heavy rainstorm that could come at any time.

At 8:00 a.m. on the 29th, the rain gradually increased, and more than 80 party members and cadres and workers of the whole center quickly formed a vanguard team of party members, leading more than 220 flood prevention and rescue team members to rush to the flood prevention site for the first time to implement flood prevention and rescue.

Always ready! Dezhou Municipal Facilities Service Center is fully staffed

The duty personnel observe the current situation of low-lying areas in real time through the video surveillance platform, provide necessary and reliable rain information for the flood prevention and rescue commando, and deal with emergencies in a timely manner. Street lamp management personnel at any time according to the water accumulation situation at any time to the water accumulation area emergency power outage, after the rain after a thorough inspection of no hidden dangers before resuming power supply.

Flood prevention and rescue commando team arrived at the scene according to the regional division, opened the rainwater manhole cover at the first time and arranged for special personnel to be on duty to ensure safety, drainage pump station personnel quickly opened the temperance gate, strong drainage pump, all inspection wells in areas prone to water accumulation were opened, protective frames were installed, and all pumping equipment such as mobile pump trucks was pressurized for pumping to ensure the safety of people's lives and property.

Always ready! Dezhou Municipal Facilities Service Center is fully staffed

As of 16:00 on the 29th, 21 low-lying sections of the low-lying road section were checked in the downtown area of Dezhou, mainly concentrated in the railway tunnel bridge and high-speed tunnel bridge, and the deepest part of the water was located in the Ruikang Road high-speed tunnel bridge hole, with a water depth of 1200 mm; the railway bridge and the riverside road bridge had been closed in 10 places.

Find reporters, reports, ask for help, major application markets download "Qilu OnePoint" APP or search weChat Mini Program "OnePoint Intelligence Station", more than 600 mainstream media reporters in the province are waiting for you to report online!

Always ready! Dezhou Municipal Facilities Service Center is fully staffed

Read on