laitimes

All of us are united to protect one side of Anlan - our city has gone all out to fight the tough battle of flood prevention and disaster relief

author:Shaoyang Daily
All of us are united to protect one side of Anlan - our city has gone all out to fight the tough battle of flood prevention and disaster relief

Shaoyang Daily Yun Shaoyang client reporter Huang Yun

At 8:30 on June 30, Shaoyang City launched a flood control level III emergency response, and on June 17 and June 24, the city has launched two flood control level IV emergency responses. Three consecutive rounds of heavy rainfall in just a few days have not only exposed many rivers in our city to greater flood discharge pressure, but also brought greater risk of secondary disasters in relevant river basins.

From June 25th to 26th, Wang Yiou, vice governor and director of the Provincial Public Security Department, led a team to Shao to supervise the flood control work, requiring resolutely implement the spirit of General Secretary Xi Jinping's important instructions on flood prevention and drought control, implement the work deployment requirements of the provincial party committee and the provincial government, adhere to the "people first, life first", compact responsibility, precise scheduling, strengthen measures, and ensure safe flooding. At many special scheduling meetings on flood prevention work, Yan Hua, secretary of the municipal party committee, and Hua Xuejian, deputy secretary of the municipal party committee and mayor, stressed the need to firmly establish the awareness of "preventing floods, fighting floods, grabbing major dangers, and relieving major disasters", forming a closed loop of responsibility, implementation, implementation, and effect, resolutely fighting and winning the tough battle of flood control, and making every effort to ensure the safety of people's lives and property and the overall stability of society.

According to the comprehensive analysis of meteorological and hydrological data, from June 16 to July 2, there were three rounds of continuous heavy rainfall in our city. From 10 o'clock on the 29th to 10 o'clock on the 30th, the cumulative average rainfall in the city was 42.9 mm, with the largest being 109.0 mm in Dongkou County; a total of 157 stations in 9 counties received more than 50 mm of rainfall, 45 stations received more than 100 mm of rainfall, and the maximum rainfall was 206.0 mm at Jingxi Station, Fengmutuan Township, Suining County; as of 10 o'clock on the 30th, the water level in Suining and Dongkou exceeded the alert level in many places. Drain waterlogging, flood control, emergency rescue and disaster relief...... Various forces are ready to take action when they hear the "flood," and this "flood prevention and defense war" is progressing in an orderly manner.

Accurate early warning and disaster prevention

"Dealing with heavy rain weather is inseparable from effective early warning and early deployment." At 13 o'clock on June 30, the staff of the Shaoyang Meteorological Observatory was receiving and analyzing meteorological data, estimating the intensity of precipitation within a certain range, and providing accurate disaster prevention and mitigation information for the rapidly changing weather.

All of us are united to protect one side of Anlan - our city has gone all out to fight the tough battle of flood prevention and disaster relief

Monitors at the Shaoyang Hydrological Center monitor changes in water levels

From 8 o'clock on June 24 to 8 o'clock on June 30, the Municipal Meteorological Observatory issued a total of 97,686 people in 113 counties in 41 phases, including 72,322 people in 57 counties in 35 phases of heavy rain, 29,807 people in 21 counties in 14 phases of rainstorm orange, 12,828 people in 7 counties in 7 phases of rainstorm red, and 29,687 people in 29 counties in 14 yellow rainstorms, and a total of 19 periods of early warning signals were issued to target 19 periods, 19 counties, 77 townships and towns, and 140072 people. It provides strong meteorological data support for rainwater research and judgment and disaster prevention.

"The work of water early warning and forecasting is the role of the whistleblower, and every uploaded data cannot be missed, and the forecast must be accurate." In the early morning of June 17, heavy rainfall poured down with thunder, the river surface was swept by the wind and waves, and the water flow was extremely fast.

Since the beginning of the flood season, the staff of Shaoyang Hydrological Center have worked hard for nearly three months, issuing a total of 48 water situation bulletins, 37 warnings (including 25 blue warnings, 11 yellow warnings, and 1 orange warning), 10 flood forecasts, and 65 rainwater consultation materials, providing timely, comprehensive and accurate hydrological support for flood prevention and disaster reduction.

"The mountain behind a villager's house in my village has loosened the mud and rocks due to heavy rainfall for several days, and there is a potential landslide." At 18:10 on June 24, Xiao Aihong, secretary of the party branch of Qingqiao Village, Yanshan Town, Dongkou County, reported to the town duty room by phone that the disaster information officer in the village found that there was a large safety hazard in the mountain next to the villager's house when he inspected the villager's Ouyang Dianjun's house. At 18:20, Ouyang Dianjun's family of 4 people were successfully transferred to a safe area for proper resettlement in accordance with the "household to help households" plan, and 10 minutes later, there was a landslide in the mountain behind the house, and the rolling rocks caused damage to the house, and a big hole was smashed in the wall, and the mud and stone mixed with the rainwater rushed straight into the house. Due to the timely transfer, a disaster accident was successfully avoided.

All of us are united to protect one side of Anlan - our city has gone all out to fight the tough battle of flood prevention and disaster relief

The traffic police direct traffic in the waterlogging control area of Qinglong Qiaotou on Shaoshui West Road. Photo by Shaoyang Daily reporter Shen Xinggang

On June 23, the Municipal Flood Control and Drought Relief Headquarters issued the "Notice on Doing a Good Job in the Prevention of Mountain Floods and Geological Disasters", and at present, the city's 2,608 disaster points and all township cadres in flash flood-prone areas are all stationed in village groups and village cadres on duty together with village cadres to help transmit flood control information and inspect the hidden dangers of landslides and debris flows.

Scientific dispatch to deal with flood conditions

At 18:45 on June 25, the "Zishui Flood No. 1 in 2024" passed through the urban section of Shaoyang City. Affected by the heavy rainfall, waterlogging occurred in many places in the urban area on the same day, and vehicles were flooded on individual road sections, and many office workers were trapped on the road by the sudden heavy rainfall. However, after just a few hours, the traffic on the affected road section gradually returned to normal, and the water receded quickly, which is closely related to the relevant work carried out by the city in advance.

All of us are united to protect one side of Anlan - our city has gone all out to fight the tough battle of flood prevention and disaster relief

On the afternoon of June 25, the warning water level broke under the Shaoshui Bridge, and the water on Shaoshui West Road was serious. Photo by Shaoyang Daily reporter Xu Lingfeng

Since entering the flood season, the city has deployed in advance, compacted responsibilities at all levels, and reserved flood control materials in advance, and the municipal urban management departments have conducted a comprehensive investigation of the key points of flood prevention in the field of urban management such as urban roads and bridges, parks and squares, industry venues, outdoor advertising and street lighting, and immediately replaced old and damaged facilities. At the same time, we will increase the daily dredging of the drainage pipe network, strengthen the daily inspection of manhole covers and drainage outlets, strengthen the safety monitoring of roads, bridges, tunnels and culverts during the flood season, adopt the "people waiting for rain" mode for the risk points that are prone to water accumulation, arrange special personnel to squat at the waterlogging points in urban areas, and start the "one point and one policy" disposal plan for the water accumulation points that interrupt traffic.

All of us are united to protect one side of Anlan - our city has gone all out to fight the tough battle of flood prevention and disaster relief

At 20 o'clock on June 25, the real scene around the bridge along the river. Photo by Shaoyang Daily reporter Xu Lingfeng

Water conservancy projects are the mainstay of resisting torrential rainstorms, which can stagger the peak of floods and discharge floods, let waterlogging drain quickly, and reduce the impact of floods on urban safety as much as possible, which is also the confidence for us to firmly grasp the initiative in flood control. Since June, 76 reservoirs in the city have overflowed, affected by local heavy rainfall and water from the upstream resource counties of Fuyi Shui, a tributary of Zishui, and some small and medium-sized rivers in Xinshao County, Shaoyang County, Xinning County, Suining County and other areas have seen varying degrees of water level increases.

According to the current water situation, flood situation and meteorological analysis, the city quickly issued a reservoir dispatching order to the Dazhen Dongfeng Reservoir and the Longmuping Reservoir at the entrance of the cave, and implemented the staggered peak of the flood in advance, including the implementation of the full-time and whole-process dispatching supervision of the Longmuping Reservoir flood gate, and the upstream flood was impounded and stored within 20 hours, and the flood peak was reduced by about 200 flows. At 22 o'clock on June 24, the Dazhen Reservoir opened the flood gate to discharge the flood, and in order to alleviate the downstream flood support, the flood discharge flow of the reservoir was controlled within 60 seconds cubic meters, which greatly reduced the upstream flood peak; At 6 o'clock on June 30, the flood detention peak of the Papaya Mountain Reservoir was delayed by 5 hours, and the flood discharge was effectively eliminated from superimposing with the downstream Xiyang River flood; From June 29th to 30th, the Liuduzhai Reservoir stopped 220 flood peaks and cut 220 peak flows, and the peak water volume of flood detention was 23.5 million cubic meters, which greatly reduced the losses suffered by the downstream of the reservoir due to flooding.

The heavy rainfall weather process is still continuing, and the whole city is fighting on the front line of disaster prevention and mitigation with a sense of tension and a sense of responsibility without distractions, and builds an "iron wall" on the flood control dam with practical actions to ensure the safety of the rivers and the people.

Read on