It has just been released by the Pizhou Flood Control and Drought Relief Headquarters
"Emergency Notice on Initiating the Level IV Emergency Response for Flood Control of Picang Floodway"
The details are as follows
▼
About the start of flood control in the Picang floodway
Emergency Notification for Level IV Emergency Response
The people's governments of all towns, the sub-district offices, and the member units of the city defense department:
At 13 o'clock today, the Municipal Hydrology and Water Resources Testing Center measured the water level of the Linzi Hydrological Station of Picang Floodway to 28.74 meters (0.24 meters above the alert), and the flow rate was 900 cubic meters per second. According to the provisions of the relevant plan, the city defense department decided to start the flood control level IV response of the Picang floodway at 14 o'clock today.
1. All towns along the Picang Floodway are requested to immediately organize an investigation of the river, evacuate all personnel and equipment in the river, remove all kinds of obstacles that affect traffic and flood discharge, and ensure the smooth flow of floodwater. The administrative person in charge of the hidden danger parts of the dangerous work immediately arrived at his post and closed the gates along the line to prevent flood backflow, and the transportation department immediately organized the evacuation of ships in the river.
2. All towns (streets) along the line shall be equipped with a complete patrol and rescue team according to the standard of 20-30 people per kilometer, and immediately carry out patrol embankment inspection of the river, especially the culvert gate stations, dangerous hidden danger sections and key defensive parts along the line to achieve uninterrupted inspections, and prepare sufficient rescue sand, stone, geotextile and other rescue materials in advance in each dangerous section, and be ready for rescue at any time.
3. All towns, member units of the prevention department, and persons responsible for flood prevention at all levels should immediately take up their posts, strengthen their guards, ensure the smooth flow of information, and make all preparations for flood prevention at any time. Arrange control and defense at each crossing into the river, and strictly prohibit unrelated personnel from entering.
Notice is hereby given.
Pizhou Flood Control and Drought Relief Headquarters July 9, 2024
Source | Pizhou Flood Control and Drought Relief Headquarters
Edit | Cheng Zhi is in charge of the editor| Zhu Yu
Editor | Zhang Rui Producer | Huang Xinlei