laitimes

2 constructions, 1 stagnant water! Pay attention to detours

2 constructions, 1 stagnant water! Pay attention to detours
2 constructions, 1 stagnant water! Pay attention to detours

Just learned from the Pizhou Highway Management Station Road Network Center, at present, the city's ordinary national and provincial trunk road network is operating normally, with a total of 2 constructions, 1 road area is too deep, please pay attention to the detour▼

1. The 310 National Highway K151 + 450-K158 + 550 up and down (Chahe Town, Pizhou City) section is fully closed for construction, prohibiting vehicles and pedestrians, and is expected to end on September 14.

2. The 310 National Highway K166 + 800-K168 + 200 up and down (Chehuishan Town, Pizhou City) section is fully closed for construction, prohibiting vehicles and pedestrians, and is expected to end on September 14. Passing motor vehicles can be detoured through 250 Provincial Highway, 311 National Highway, 251 Provincial Highway, 252 Provincial Highway, Shandong 318 Provincial Highway, and Shandong 231 Provincial Highway.

3. The provincial highway 250K1 + 895 in the north of Zouzhuang Town is too deep, resulting in the inability of vehicles to pass normally. In order to ensure the safe passage of vehicles and vehicles, please take a detour from National Highway 310 to National Highway 205 to Provincial Highway 230.

Please prepare for your trip in advance to ensure safety.

Source | Pizhou Highway Management Station Road Network Center

Edit | Cheng Zhi is in charge of the editor| Zhu Yu

Editor | Zhang Rui Producer | Huang Xinlei

2 constructions, 1 stagnant water! Pay attention to detours

One

2 constructions, 1 stagnant water! Pay attention to detours

A dime

One

2 constructions, 1 stagnant water! Pay attention to detours

Sanmao

Can I do it today

Drink coffee for a pick-me-up

It's all up to everyone's peace

↓ ↓

Read on