It is expected that from 17 o'clock on July 24 to 20 o'clock on the 25th, there will be heavy precipitation of more than 70 mm of hourly rainfall in most areas of the city, and secondary disasters such as flash floods, debris flows, and landslides induced by heavy precipitation may occur in mountainous and shallow mountainous areas, and water may accumulate in low-lying areas. In response to this rainfall, the Fangshan Highway Branch attached great importance to it and immediately launched the flood control plan.
Attach great importance to it and immediately enter a wartime state. After receiving the early warning, the sub-bureau immediately held a meeting, and the work requirements were conveyed to all practitioners in the jurisdiction, so that all flood control participants could be nervous ideologically and take action in their work.
Respond immediately and assemble flood control support forces. In response to this rainfall, the sub-bureau arranged a total of 509 people on duty. A total of 228 sets of machinery and vehicles were arranged. According to the management and distribution of the road network in Fangshan District, 8 emergency material reserve points and 4 categories of materials have been set up in Yancun, Guandao, Liulihe, Changgou, Shidu, Hebei Town, Shanchuan and Da'anling to meet the requirements of the "two 1 hour" rescue time limit.
Preset in advance, and strengthen monitoring of key parts. For the points that are prone to water accumulation, we have a total of 17 concave road sections in our sub-bureau. Among them, there are 9 management and maintenance pumping stations, 2 non-management and maintenance pumping stations, and 6 concave water points under no pumping stations, and a total of 76 personnel are arranged on duty. The key prevention and control of the paper mill pumping station, cement plant pumping station, second station pumping station, Guzheng Road K2+800 water accumulation point, each 6 people, the rest of the points 4 people. If the water level exceeds 27 cm, the circuit will be cut off immediately. For key water-prone road sections, drainage equipment and rescue team members have been sunk to the front line on duty.
Patrol and guard the disaster sites in mountainous areas. There are a total of 150 geological hazards on duty in Fangshan District, involving 12 mountainous routes. Patrol duty is divided into three categories: daily patrol, mobile guard, and intersection guard. In response to this round of rainfall, the sub-bureau set up warning signs at 6 important intersections of Liushi Road, Shixia Road and Junhong Road, and arranged 12 personnel to be on duty and persuade them to return. If any signs of collapse and rockfall are found during the mobile inspection of ground disasters, active road cutting measures should be taken immediately, and the nearest rescue team should be mobilized to eliminate the danger as soon as possible to ensure the safety of the operation of the mountain road.
Strengthen linkage and work closely with the government and departments. The sub-bureau has established a linkage mechanism with more than 10 territorial governments and district traffic detachments such as Liangxiang Town and Doudian Town. In case of stagnant water or landslides, they can request their assistance in breaking the road and persuading them to return, and come forward to coordinate and appease the negative emotions of the masses to ensure the safety of citizens. Emergency duty to ensure that on-the-job responsibility. Strictly implement the emergency duty system of the sub-bureau, and the members of the flood control leading group, the leaders and the personnel on duty are all in place, and always pay attention to the operation of the facilities and changes in the flood situation. In case of emergencies, strictly implement the relevant requirements for information reporting, ensure the timeliness and accuracy of information reporting, and resolutely ensure that there is no delay, concealment, or omission.
(Contributed by: Fangshan Highway Branch)