At present, the mainland is in a critical period of flood control, and the flood control situation is grim and complicated. In order to test and improve the team's ability to deal with flood disasters and earthquake disaster risks, build a practical training and joint exercise and training mechanism for the members of the Daxinganling Regional Disaster Reduction Committee, further improve the ability of rapid response, dispatching and command, coordination and organization, and firmly grasp the initiative in rescue work, on the morning of July 31, the Daxinganling Regional Emergency Management Bureau, the Daxinganling Regional Forest Fire Detachment, the Daxinganling Regional Fire and Rescue Detachment, the Daxinganling Regional Earthquake Monitoring Center and other units jointly carried out the project on the Ganhe River in Jiagedaqi District. Longwei · 2024-Ping An Xing'an "flood prevention and earthquake drill.
Drill site
In this simulated combat exercise, heavy rainfall in Jiagedaqi District for many days, and a 4.8-magnitude earthquake broke out, and the local transportation, water supply, power supply and other lifeline projects were slightly damaged, and the earthquake level III emergency response was initiated. Due to continuous heavy rainfall, the water level of the Ganhe River section in Jiagedaqi District rose, the slope protection of the dam collapsed, and the river water backflow caused flooding, and the flood control level III emergency response was initiated.
Drill site
During the flood control exercise, the commanders and fighters of the rapid response detachment of the forest firefighting detachment in the Daxinganling area wore a full set of water rescue equipment and drove boats to carry out intense and orderly rescue on the surface of the Ganhe River with scientific and professional rescue skills and skillful skills. It is reported that the drill presupposes the collapse of the dam slope protection in the Ganhe River section, the camping people are trapped on the island, the anglers are trapped on the bridge pier, the boat overturns and falls into the water, and the vehicle is trapped on the flooded road.
Drill site
Drill site
"Due to the rising river, 2 anglers are trapped on the bridge pier and are in urgent need of rescue, in urgent need of rescue!" I saw that the rescuers drove the boat to the upstream position, and the rescuers jumped into the water from the back of the boat, swam to the trapped people in an offensive swimming style, put on the water life-saving equipment for the trapped people and sent a gesture signal to the boat towing personnel, and the towing personnel pulled the towing rope close to the boat, and finally successfully rescued the trapped people on the boat.
Drill site
"The road on the south side of the Ganhe Bridge overflowed the road due to the continuous rise of the river, 2 private cars were trapped, the water continued to rise and the trapped people were transferred to the roof of the car to wait for rescue, 2 people accidentally fell into the water and urgently needed rescue!" The fire commander dispatched the drone to quickly survey the terrain and drop life jackets to the people who fell into the water, and one rescuer operated the R1 water rescue robot to drive to the people in the water to carry out rescue.
Drill site
Based on the requirements of flood prevention, disaster relief, and disaster relief, the joint exercise effectively improved the level of linkage and cooperation between the forest fire brigade in the Daxinganling area and the member units of the regional disaster reduction committee to deal with sudden floods and earthquake disasters, further enhanced the awareness of linkage and emergency response, and provided ideas and accumulated experience for the next step of scientific and efficient rescue training.