On September 11, the heavy rainfall weather warning in the Jianhu area changed from yellow to orange in the afternoon, and the Jianhu Highway Department immediately launched an emergency response to strictly implement the requirements of "three pipes, three should be three implementations", and the highway network center was led by a total of 6 people with shift leaders and on-duty personnel to conduct 24-hour real-time monitoring of road conditions, and set up 5 inspection teams to strengthen highway inspections in the jurisdiction to ensure timely detection and disposal of dangerous situations.
With the advent of the night, the rainstorm is getting bigger and bigger, the road drainage pressure rises sharply, at 7 o'clock in the afternoon, after the inspection found that the county road star road railway underneath the water danger, the highway emergency team immediately dispatched, the county bureau and the center responsible comrades in the front line of the danger command and dispatch, in the face of the danger, unite as one, the control group to close the dangerous road section of the traffic, the obstacle removal group to find the cause of the waterlogging, the drainage group erected equipment for dredging, everyone division of labor and cooperation, the rescue work is against time, orderly. As of 4 a.m. on the 12th, all the stagnant water was cleared and road traffic was restored. In this emergency operation, the highway department dispatched a total of 6 inspection vehicles, 1 anti-collision vehicle, 2 mobile emergency pumps, and 55 emergency personnel.
In the next step, the Jianhu Highway Department will continue to strengthen emergency duty, carry out solid highway inspections, and investigate and maintain key prevention parts such as underpass pump rooms and water-prone road sections to ensure the safety and smoothness of highways. (Contributed by Zheng Hu Li Wei)
Editor: Tang Zhixing