laitimes

The main structure of the film and television cultural and creative entrepreneurship base project has been fully capped!

September 15

Film and television cultural and creative entrepreneurship base project

The main structure is fully capped

The next step of the project will be to enter the decoration stage

The main structure of the film and television cultural and creative entrepreneurship base project has been fully capped!

The project has been around since its inception

Gather people and quickly enter the market

Take safety as the red line and quality as the bottom line

Lay out the main line of construction

Overcome the narrow site, high-voltage line coverage,

There are many difficulties such as pipeline relocation and drawing modification

In the golden September

Complete the full capping of the main structure

Achieve high standards and high quality performance

Technology is the first line to improve value creation

Actively play the role of technology leadership and innovation drive

Promote the smooth and rapid development of construction work

Widely used four new technologies

Tie rod type cantilever formwork support technology is adopted

Solve the construction problem of high-rise large cantilever structure

The main structure of the film and television cultural and creative entrepreneurship base project has been fully capped!
The main structure of the film and television cultural and creative entrepreneurship base project has been fully capped!

In-depth application of green construction technology

Through the reuse of wasteland, temporary roads and permanent integration, etc

Implement the concept of green construction and reduce resource consumption

The main structure of the film and television cultural and creative entrepreneurship base project has been fully capped!
The main structure of the film and television cultural and creative entrepreneurship base project has been fully capped!

BIM technology is applied in the whole cycle to realize the integration of design and construction

Perform complex node optimization and space clearance analysis

Comprehensive layout of pipelines, pipeline collision inspection, etc

Solve drawings and technical problems in advance

The main structure of the film and television cultural and creative entrepreneurship base project has been fully capped!
The main structure of the film and television cultural and creative entrepreneurship base project has been fully capped!

Project Brief Introduction

The main structure of the film and television cultural and creative entrepreneurship base project has been fully capped!

Film and television cultural and creative entrepreneurship base project

It is located in the south of Chengdu Film and Television City, Tuanjie Town, Pidu District, Chengdu

The total construction area is about 40,000 square meters

It is a high-rise building integrating commerce, office, hotel and supporting facilities

After completion, it will further optimize the employment environment in the region

Improve supporting facilities for employment services

Shape the new look of the quality city in Pidu District.

Read on