September 15
Film and television cultural and creative entrepreneurship base project
The main structure is fully capped
The next step of the project will be to enter the decoration stage
The project has been around since its inception
Gather people and quickly enter the market
Take safety as the red line and quality as the bottom line
Lay out the main line of construction
Overcome the narrow site, high-voltage line coverage,
There are many difficulties such as pipeline relocation and drawing modification
In the golden September
Complete the full capping of the main structure
Achieve high standards and high quality performance
Technology is the first line to improve value creation
Actively play the role of technology leadership and innovation drive
Promote the smooth and rapid development of construction work
Widely used four new technologies
Tie rod type cantilever formwork support technology is adopted
Solve the construction problem of high-rise large cantilever structure
In-depth application of green construction technology
Through the reuse of wasteland, temporary roads and permanent integration, etc
Implement the concept of green construction and reduce resource consumption
BIM technology is applied in the whole cycle to realize the integration of design and construction
Perform complex node optimization and space clearance analysis
Comprehensive layout of pipelines, pipeline collision inspection, etc
Solve drawings and technical problems in advance
Project Brief Introduction
Film and television cultural and creative entrepreneurship base project
It is located in the south of Chengdu Film and Television City, Tuanjie Town, Pidu District, Chengdu
The total construction area is about 40,000 square meters
It is a high-rise building integrating commerce, office, hotel and supporting facilities
After completion, it will further optimize the employment environment in the region
Improve supporting facilities for employment services
Shape the new look of the quality city in Pidu District.