recently
A number of netizens consulted on the Sichuan platform
The official opening time of the section from Jiukou to Zhaojue of Lexi Expressway
on this
The Sichuan Provincial Department of Transportation responded
Lexi Expressway Mazhao Section 9 to Zhaojue Section is actually Lexi Expressway Mabian to Zhaojue Section 9 Kou Interchange to Zhaojue Interchange Section, the section has completed the construction of the project, because the section can not be connected to the province's highway network at present, specifically by Liangshan Prefecture to implement the operation and management.
After the demonstration of the Liangshan Prefecture Traffic Police Department, because the section needs to provide construction and transportation service guarantee for the construction of the Jiukou to Meigu section of the project, if the traffic is opened, the social vehicles will be intertwined with the construction vehicles, and there are serious safety hazards, and it is planned to wait for the Jiukou to Meigu section to be completed and opened to traffic at the end of December 2024, and the official opening time will be subject to local announcements.
↓Click on the image for full size↓
It is reported that the Mabian to Zhaojue section of the Lexi Expressway is one of the 8 longitudinal lines of the "Sichuan Provincial Expressway Network Planning", the project route starts from Minjian Town, Mabian Yi Autonomous County, Leshan City, and connects to the Mabian branch of the Renmu New Expressway, passing through Leibo County, Meigu County, Liangshan Prefecture, and ending at the south side of Zhaojue County, connecting with the Xichang to Zhaotong Expressway.
Among them, the section from Jiukou to Zhaojue of Lexi Expressway starts from Jiukou Township, Meigu County, Liangshan Prefecture, and ends on the south side of Zhaojue County, with a total length of 32 kilometers and a bridge-tunnel ratio of about 65%. The route involves 4 interchanges and 2 service areas, namely Jiukou Interchange, Layimu Interchange, Zhuhe Interchange, Zhaojue Interchange, Meigu Service Area (Area B), and Zhaojue Service Area.
Lexi Highway Sub Mognette Bridge. According to the Sichuan Highway Institute
At present, the construction of Lexi Expressway is speeding up and is expected to be opened to traffic in 2025. At that time, it will only take one and a half hours from Meigu County to Leshan City, and only three and a half hours from Chengdu City. After the project is opened to traffic, it will completely end the history of Meigu and Zhaojue counties without expressways, and the completion and opening of the project will play an important role in consolidating the achievements of poverty alleviation, helping rural revitalization, and opening up the dual traffic channels in the Chengdu Plain and Panxi areas.
Source | Sichuan released the client comprehensive political Sichuan platform, Liangshan Daily, and Sichuan Highway Institute
Edit | Zhang Xiaolan