laitimes

Set sail! The last ship of rods on the Paltrow Bridge in Canada was successfully shipped

author:CREC China Railway Zhang Xin

June 29th

Canada Paltrow Bridge participated in the construction of China Railway Mountain Bridge

The last ship of steel structure members was successfully shipped

It marks the successful conclusion of the project manufacturing

It is one step closer to completion and opening to traffic

Set sail! The last ship of rods on the Paltrow Bridge in Canada was successfully shipped

The rods shipped this time were in a variety of forms, with a total of 183 bales and about 2,055 tons. These include three members of the largest unit of the whole bridge, the main beam members of the north approach bridge. The members of the unit are about 7 meters high and weigh 160 tons, and the members are transported by heavy-duty low-plate special transport vehicles. In addition, it also includes the longest arc member of the whole bridge, the main longitudinal member of the ramp bridge. The special shape of the rod not only brings difficulties to the processing and manufacturing, but also brings great challenges to the port collection and shipping work.

Set sail! The last ship of rods on the Paltrow Bridge in Canada was successfully shipped

The manufacturing of Paltrow Bridge in Canada implements the dual standards of Canada and the United States, and China Railway Mountain Bridge is responsible for the manufacturing, painting, and delivery of the bridge.

In the manufacturing process, China Railway Mountain Bridge strictly follows the 100% self-inspection of the weld of the whole bridge, the 100% re-inspection of the supervision of the general contractor, and the 100% trial assembly of the whole bridge in the factory, and the use of phased array ultrasonic imaging detection and other technologies to successfully complete the manufacturing and shipping tasks of the bridge. The high-quality products and sincere service have been fully affirmed by the Canadian owners and general contractors.

Set sail! The last ship of rods on the Paltrow Bridge in Canada was successfully shipped

The Paltrow Bridge in Canada has a total length of about 1,530 meters and a total weight of about 14,635 tons, and a total of eight ships were shipped to Vancouver, Canada. At present, the construction of the main tower of the Canadian construction site has been completed, and the bridge tower has become the tallest bridge tower in British Columbia, Canada, and the erection of other bridge sections is progressing in an orderly manner.

Set sail! The last ship of rods on the Paltrow Bridge in Canada was successfully shipped

With the world's leading bridge steel structure manufacturing technology, equipment, high-quality products and services, China Railway Mountain Bridge has successfully realized the span of five continents of bridges, and has shown a Chinese business card in the field of international bridges. China Railway Shanqiao will uphold the high standard of "Made in China", continuously improve the quality level and core competitiveness, and make new and greater contributions to the development of world transportation.

Source: China Railway Mountain Bridge

Read on