On July 20, Chen Lian, member of the Standing Committee of the Municipal Party Committee and secretary of the Shiquan County Party Committee, and Liang Hong, deputy secretary of the Shiquan County Party Committee and county magistrate, respectively went to Zhongchi Town, Yingfeng Town and Lianghe Town to supervise the flood control and anti-skid work. Yu Daigen, member of the Standing Committee of the Shiquan County Party Committee, Secretary of the Commission for Discipline Inspection and Director of the Supervision Commission, Zhu Youfeng, deputy head of the county government, Wang Chaoxia, vice chairman of the county CPPCC, and Wang Quanbo, director of the Management Committee of the Economic Development Zone and director of the County Bureau of Natural Resources, supervised together.
Chen Lian successively went to Chopsticks Pu Village, Chali Village, Zhongchi Town, Jizhen Community, Honghuaping Village, Wutongsi Village, Yingfeng Town, and inspected the prevention and control of key areas such as road damage, geological disaster monitoring points, bridges, and river cliffs, and learned in detail about the implementation of personnel transfer and resettlement, infrastructure repair, transfer of people's livelihood support, emergency rescue and rescue. Chen Lian demanded that at present, we are in the critical period of flood prevention in the "seven lower and eight upper" periods, and it is necessary to strictly implement the "five musts" flood prevention work discipline, closely monitor the changes in rain, water, and flood conditions, give prominence to the safety and precautionary work of key areas such as rivers, streams, ditches, small reservoirs, embankment channels, and hidden danger points of land disasters, as well as key groups such as the elderly living alone, left-behind children, and the disabled, implement the early warning "call and response" mechanism and the "early monitoring and evacuation" prevention measures, resolutely and resolutely and thoroughly transfer the people involved in danger, and ensure the basic livelihood of the people affected by the disaster. On the premise of ensuring safety, it is necessary to make overall plans for the investigation of disasters and nuclear disasters, the repair of facilities, the self-rescue of production, and the resettlement of the people affected by the disaster, organize emergency rescue and disaster relief in a scientific and orderly manner, and restore normal production and life order as soon as possible. It is necessary to strengthen the reserve of flood control materials, strengthen the empowerment of science and technology, comprehensively improve the ability of disaster early warning and response, and minimize the losses caused by disasters. It is necessary to strictly implement the system of 24-hour flood control emergency duty and emergency information reporting, so as to ensure that major dangers and emergencies are discovered, reported and dealt with in a timely manner. It is necessary to adhere to unified command and dispatch, cooperate closely, and unite a strong joint force to overcome difficulties together to ensure the safety of the county.
In Gonghe Village, Xingping Village, Jizhen Community and other places in Lianghe Town, Liang Hong inspected the flood-damaged roads and river embankments, geological disaster monitoring and early warning, and the implementation of flood control responsibilities, and learned in detail about the resettlement guarantee of the evacuated people, the implementation of emergency prevention measures, the emergency repair of infrastructure, and the emergency duty of flood control. He stressed that it is necessary to fully understand the severity and complexity of the current flood prevention work, pay close attention to the key parts and weak links of geological disasters, continue to do a good job in meteorological monitoring and forecasting and early warning, pay close attention to the investigation of hidden dangers and emergency response, tighten and consolidate the chain of responsibility, strictly implement the work system of leaders leading shifts and being on duty, and make every effort to implement various measures for flood prevention, disaster reduction and disaster relief. It is necessary to carry out the work of statistical reporting of the disaster situation in a timely manner, pay close attention to formulating plans for the repair and treatment of damaged roads, river embankments and sewage pipe networks, strengthen upward docking, restore normal production and life order as soon as possible, and minimize disaster losses.
During the period, Liang Hong also investigated the progress of the health tourism construction project in the Lianghe Materia Medica Valley and held an on-site office meeting to coordinate and solve the problems encountered in the construction. He stressed that Lianghe Town and relevant departments should adhere to the guidance of planning, scientifically formulate construction plans, and make every effort to accelerate the construction progress of the project. It is necessary to improve the supporting facilities, rationally lay out the landscape attractions and functional facilities, promote the improvement of the living environment, the improvement of public service facilities and the improvement of rural governance efficiency, and continuously enhance the comprehensive service capacity of scenic spots. It is necessary to pay close attention to the difficulties and blocking problems of project construction, take the initiative to provide services, study and solve enterprise difficulties in a timely manner, and ensure that the "Eleventh" park will open and operate as scheduled.
Shiquan Financial Media Reporter: Li Maomeng, Wang Li