laitimes

Kangding flash flood and debris flow: when emergency rescue is in progress

Kangding flash flood and debris flow: when emergency rescue is in progress

Title Laiyuan editing

Article content:

Kangding Expressway "The bridge connecting between the two tunnels collapsed" and caused the vehicle to fall......

Loading...

In the early morning of August 3, a sudden flash flood and mudslide disaster hit the city of Kangding in Ganzi Prefecture, Sichuan. The section of K120 + 200m in Kangding of the G4218 Yaye Expressway was severely damaged, and the connecting bridge between the two tunnels collapsed, and the road was interrupted in both directions.

The viaduct collapsed in both directions

Kangding flash flood and debris flow: when emergency rescue is in progress

Picture: Laiyuan crop

As of 12 o'clock on August 4, the disaster has caused distressing casualties and disconnection. A total of 11 people in 4 vehicles fell under the bridge, 1 person was rescued and sent to the hospital, 2 people were killed, and 8 people were missing; Six people were also killed and 11 were missing.

In the face of the disaster, Kangding acted quickly. A large number of rescue forces have been put into the rescue and disaster relief work. A total of 1,554 rescue personnel, 311 sets of vehicles and engineering equipment, 68 sets of communication equipment, more than 1,500 pieces of rescue equipment, 8 search and rescue dogs, 1 light helicopter and 1 large unmanned aerial vehicle (UAV) have gone into battle to search and rescue the missing people, carry out medical treatment and ensure transportation, electricity and communications.

Kangding flash flood and debris flow: when emergency rescue is in progress

Picture: Laiyuan crop

Kangding flash flood and debris flow: when emergency rescue is in progress

Picture: Laiyuan crop

In terms of resettlement of the affected people, 939 people were evacuated in an orderly manner by moving into centralized resettlement sites and staying with relatives and friends. The water supply, power supply, accommodation, food and other services in the four resettlement sites of Langgu Village, Xiagasi Lithium Mine, No. 2 Community, and No. 1 Middle School have been properly solved, so that the livelihood of the affected people has been basically guaranteed.

At the same time, Kangding has also established a perfect aftermath comfort work mechanism, Kangding City four sets of team members "one-to-one" to comfort the work, and actively formulate the disposal of the victim's remains and family reception, comfort plan, patiently listen to the opinions and demands of the family. For tourists and truck drivers stranded due to road disruptions, the local government has also taken active actions to collect and solve relevant demands through the "110" and "12345" government service platforms, and a total of 202 service points have been set up across the state to serve tourists, and 8 truck driver service points have been set up in Kangding City and Luding County, and temporary service points have been opened according to the actual situation. I believe that with the joint efforts of all parties, Kangding will be able to overcome this disaster and rebuild a better home.

In this regard, what do you think about the collapse of the bridge between the high-speed tunnels, and there are casualties and vehicle falls? Welcome to leave a message in the comment area to discuss!

Kangding flash flood and debris flow: when emergency rescue is in progress

Picture Laiyuan Network

Read on