laitimes

Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!

author:New Future Featured Newsletter

Originated from丨China Construction Eighth Bureau and a company

How should the temporary road at the construction site be paved? Cast-in-place concrete is of good quality, but it is labor-intensive and time-consuming, and not environmentally friendly; The steel plate is easy to lay, but it is unsafe and has a poor image. The prefabricated temporary road independently designed, produced and installed at the construction site of China Construction Eighth Bureau is comparable to cast-in-place concrete pavement in terms of quality, and it is better than the traditional steel plate temporary road in terms of safety and beauty.

Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!

Prefabricated roads, as the name suggests, roads are composed of a piece of board surface, which is prefabricated in advance, and can be paved into a road when pulled to the site, which can be dismantled and reused at any time in the later stage, which is very different from traditional roads.

Four advantages

01

The construction efficiency is high

The prefabricated road reduces multiple links such as cast-in-place and solidification, which can greatly save the construction period. The 360-meter temporary construction road was completed in only 3 days, saving 5 days compared with the traditional steel plate pavement time.

Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!

02

High degree of standardization

All prefabricated road slabs are customized by industrialized factories, which can be built quickly, flexibly and orderly, with a higher degree of industrialization and standardization, and more guaranteed quality.

Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!

03

Green and environmentally friendly

Prefabricated roads can greatly reduce the generation of construction waste, repair and replacement is fast, green and environmentally friendly, and can achieve the construction goals of rapid assembly and disassembly, recycling, zero discharge, and zero solid waste.

Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!

04

Recycling

The prefabricated road slab is reusable and can be used in the temporary road construction of multiple projects, which greatly improves the level of on-site civilized construction and maximizes economic benefits.

Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!

Transcript of the process

Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!

Product design

Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!
Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!

Production of prefabricated components

Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!

Finished product display

Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!

Construction and installation process

Can the construction road be paved like this? Comparable to cast-in-place, better than steel plate!

Effect after the completion of construction

Read on