On June 28, after the fourth-level emergency response for flood control in Weng'an County was launched, the county water affairs bureau arranged scheduling in a timely manner, implemented various prevention and response measures for flood prevention and disaster relief in advance, and made every effort to ensure the safety of people's lives and property. That night, the county water affairs bureau led the leaders and personnel on duty to closely monitor the rise of water levels at various monitoring points such as reservoirs, rivers and mountain flood risk areas, and adopted a "call and response" reminder mechanism to safely transfer 4 households and 6 people in the flash flood risk area.
The expert group of the county water affairs bureau went to the mountain pond behind Baisha Village Street in Jianzhong Town to deal with the hidden danger of the overflow dam
On June 29, the "three responsible persons" of the 47 reservoirs of the County Water Affairs Bureau and the cadres and employees of the reservoir service stations in the 8 districts were all in place, focusing on the upstream and downstream dam slopes, dam feet, spillways, water discharge facilities around the exits, near the dam slopes and other water conservancy facilities to inspect and defend, and found that potential safety hazards were dealt with and reported in a timely manner.
The expert group of the county water affairs bureau negotiated with the cadres of Zhongping Town and village to deal with the hidden danger of the Tangwan Shantang flooding dam
The cadres and employees of the reservoir service center in the Zhongping area participated in the disposal of the hidden danger of the Tangwan Shantang flooding dam
On June 29, after the "three responsible persons" of the township Shantang found that there was a flood dam, endangering the safety of the Shantang and the risk of dam failure, the leadership team of the County Water Affairs Bureau led the expert group to quickly rush to the scene and cooperate with the town and village cadres to eliminate the hidden danger of dam failure in a timely manner by taking measures such as lowering the high-rise spillway floor and laying emergency waterproof color striped cloth.
The county water affairs bureau distributed emergency supplies to the townships
At present, the county water affairs bureau has distributed a total of 900 square meters of emergency waterproof color striped cloth, 7 pumps, 300 woven sandbags, 200 meters of water pipes, and 30 sets of raincoats to the county's demand townships. All work is still being carried out in an intense and orderly manner......
Source: Weng'an County Rong Media Center
Correspondents: Lu Xijiang, Lei Fuyu
Editor: Chen Shanxuan
First trial: Ran Tingting
Second trial: Li Yongchun
Final review: Gu Qiao