It was getting dark, and it was raining heavily.
"Well, it seems that it will not work." Seeing that it was approaching the end of work, Li Jin, the manager of Chongqing Tiantian Zhixin Technology Co., Ltd., sighed again and again, carrying a large stack of materials and hesitated in front of the service desk. Seeing this, Liang Wencui, the deputy commissioner, immediately stepped forward to ask.
It turned out that Li Jin was in a hurry to handle the change of the enterprise, and finally got together the handling materials, so he hurried to handle it, but he didn't know where to start in the face of many choices.
"Come, teacher, give me all the materials, and I'll take you here to do it online." Liang Wencui took Li Jin to the self-service area of the assistant agency, uploaded and submitted the materials one by one, and entered and reported the whole process. She looked at her watch - it only took 1 hour to efficiently complete all the online change requests.
"In the past, you needed to bring your own materials to different windows to handle it, but now you only need to submit a change material to the government affairs hall to complete the changes to the articles of association, supervisors, etc., which not only saves time, but also saves physical strength to avoid running back and forth, which is so convenient!" Li Jin couldn't hide her excitement.
The reporter learned that the Science City is based on reality, accelerates the improvement of the whole life cycle service chain of enterprises, continuously optimizes the business environment, makes every effort to do a good job in enterprise services, and does everything possible to solve problems, do practical things, increase confidence and add impetus to enterprises, so that enterprises can "enter, retain and develop well".
What services are available?
01
——The whole chain of "packaging office"
Focusing on the whole life cycle of project introduction, start-up, and production, Science City has comprehensively built a "1+8+N" assistant agency service system (i.e., 1 service team, 8 service areas linkage, and N matters to be handled by the assistant), and promoted the "package handling" of 55 approval services for investment promotion and key enterprises; "Signing as a service" for investment projects, helping agents throughout the process, carrying out "one-to-one" nanny services for key enterprises, turning the "relay run" of project approval into a "100-meter sprint", promoting the settlement, start of construction and construction of investment enterprises for more than 3 months, and handling registration and settlement for more than 400 investment promotion enterprises, with an enterprise satisfaction rate of 100%.
02
-- "Nearby Office" in all fields
In addition, focusing on the characteristics, problems and needs of business entities, Science City empowers all districts and parks with government services, and builds a new "1+2+10" enterprise service system ("1 is the government affairs service center of the high-tech zone, "2" is Xiyong Microelectronics Park Company, High-tech Development Group, and "10" is 10 towns and streets) around the whole life cycle stage of enterprises in start-up, production and operation, and project construction. The cross-level "all-for-one service" has created a "15-minute enterprise service circle", realized that the enterprise services in the park "run at most once nearby", and handled more than 85,000 cases in total. At the same time, the town street will integrate the "grid + help agency" into the whole process of enterprise services, set up a grassroots enterprise service team that integrates economic development posts, government service posts, community grid members and other forces, and promotes the preferential enterprise policy into the park and enterprises, and the door-to-door handling of enterprise-related matters and grid help agents.
03
——The whole process is "done at one time"
It is worth mentioning that in order to further improve the quality of service enterprises, implement the "one thing at a time" service for 41 important stages of municipal enterprises from start-up to production and operation, policy services, etc., innovate 27 leading reforms such as "land delivery and certification", "land delivery and construction", and environmental impact assessment "three evaluations in one", promote the multi-party linkage of construction, planning, land and other departments, and start construction 2 to 3 months in advance, so as to realize the seamless connection between "land delivery" and "construction". Integrate the "good service" of government affairs into the "whole cycle" of project construction, make every effort to play a good role in the combination of reforms, and speed up the whole process of approval by more than 50%, so as to add energy and momentum to high-quality development.
Editor-in-chief: Deng Xiaowei丨Deputy editor-in-chief: Li Haoyang
Editor-in-Chief: Li Tongtong丨Editor-in-charge: Wang Qian
Reporter: Wu Fuqiang | Editor: Fan Xingxin|Proofreader: Zhou Yi
Produced by Chongqing High-tech Zone Financial Media Center
It may not be reproduced without permission
Copyright Notice: In addition to the original content and special instructions, the text and pictures of the push manuscript are from the Internet and major mainstream media. The copyright belongs to the original author. If you believe that the content is infringing, please contact us to remove it.