laitimes

Hearing the flood and moving to fight the torrential rain - the silhouette of the work of water conservancy people in Yongding District

author:Red Network Zhangjiajie Station

Red Net Moment News, June 28 (Correspondent Baimei) Affected by strong convective weather, in mid-June, Yongding District had the widest range and the most intense rainfall process since the flood, with a total of 2 rounds of heavy rainfall, with a cumulative rainfall of 310.5 mm, and 22 reservoirs in the region overflowed, and the flood control situation was severe.

On June 25th, Yongding District Flood Control Command launched flood control level III emergency response, and on the 26th, Zhangjiajie Municipal Water Conservancy Bureau launched flood prevention level III emergency response.

Hearing the flood and moving to fight the torrential rain - the silhouette of the work of water conservancy people in Yongding District

On the evening of the 27th, the Flood and Drought Disaster Prevention Center of the Water Conservancy Bureau was brightly lit, and Song Xianwu, secretary of the Party Leadership Group, stared at the weather forecast display screen with full attention, paying close attention to the rain and real-time monitoring of satellite cloud images. The 10 personnel on duty, some of whom reported the real-time water level on the flood and drought disaster prevention system, some paid attention to the rainwater monitoring and operation management system, some gave telephone warnings to the townships and towns with heavy rainfall in the northwest of the district, and some were counting the disaster situation in the townships and towns.

At the same time, Qin Yuping, a member of the party group, took a group of experts to the Shuangxia Reservoir of the Guanliping Office to guide and inspect the flood control work, and then immediately rushed to Dayongqiao Street to coordinate and deal with the problem of safe water release from the Yukou Reservoir; Qin Chunyun, deputy secretary of the party group, rushed to Yuanguping, the most remote township in Yongding District, with technicians to check the overflow of Feitan Reservoir overnight; Senior water conservancy experts Deng Minzhou and Song Chunyuan walked the slippery mountain road with umbrellas and flashlights, and went to Jiaoziya Town to check the rectification of the hidden dangers of the backbone mountain pond in Pozi Village; All the cadres and employees of Hongbiyan Reservoir and Xiehe Reservoir are on duty, A post is on duty in the organ, and B post is on duty on the dam to ensure the safety of reservoir operation; 30 urban waterlogging rescue and disaster relief personnel and 20 rural water supply emergency repair teams are on standby 24 hours a day, ready to set off at any time.

Hearing the flood and moving to fight the torrential rain - the silhouette of the work of water conservancy people in Yongding District

At 8 o'clock on the 28th, the flood control consultation room held a meeting of the expert group to summarize the potential safety hazards identified, study the disposal plan and arrange specific tasks in combination with the rectification tasks issued by the district. After the meeting, the members of the expert group hurried to the townships (streets) to carry out technical guidance on flood control services for water projects. The secretary of the party group, the person in charge of the flood and drought disaster prevention center, the small hydropower management station, and the person in charge of the reservoir management unit investigated the operation of the Huangmaoxi reservoir on the spot.

Hearing the flood and moving to fight the torrential rain - the silhouette of the work of water conservancy people in Yongding District

The Water Conservancy Bureau of Yongding District has a clear understanding of the current severe situation of flood control, strengthens bottom-line thinking, establishes a strong sense of risk, organizes and mobilizes cadres and workers across the board, goes all out to carry out flood prevention, rescue and disaster relief work, and strives to hand over an answer sheet that satisfies the people and reassures the masses in this flood control examination.

Read on