laitimes

Finalist | The results of the international solicitation of the conceptual scheme of the source of scientific and technological innovation in Jinyi Lake

author:Jianwen Zhizhu

4 consortiums, including Zaha, Shenzhen General Institute, and Tsinghua Institute, were shortlisted The results of the international solicitation of the conceptual scheme of the source of scientific and technological innovation in Jinyi Lake

Finalist | The results of the international solicitation of the conceptual scheme of the source of scientific and technological innovation in Jinyi Lake

1. Registration

The pre-announcement of this international solicitation was released on March 29, 2024, and once released, it attracted great attention from many well-known design institutions at home and abroad. By the end of registration on April 27, a total of 68 design units and 34 groups of consortiums have signed up, including international design teams and domestic strength compounds, and the participating teams not only include many international top design teams that have been deeply cultivated in the fields of urban, architecture and landscape design for many years and have rich practical experience, but also include teams from state-owned institutes and famous university design institutes with strong comprehensive strength, as well as a number of cutting-edge design firms with avant-garde design concepts and outstanding performance in large-scale competitions in recent years.

After a rigorous and systematic material review, 56 design units and 24 consortiums met the application qualifications. The conceptual proposals submitted by the participating applicants have their own characteristics, not only with innovative design concepts, but also from the aspects of urban development, industrial planning, and the style of the lake area.

2. Shortlisted units

After careful review and full discussion, the six participating consortium units shortlisted in the first round and the second round of expert review meeting were submitted to the organizer for approval, and the list of shortlisted and alternative consortium units was finally determined as follows (in no order):

1. Zaha Hadid Limited (Zaha Hadid Architects), Architectural Design Consultants (Beijing) Co., Ltd., and Cushman & Wakefield Real Estate Consulting (Shanghai) Co., Ltd.;

2. Hangzhou Zhonglian Zhujing Architectural Design Co., Ltd., (Daniel Statham Firm) Zhaoshen Design Consulting (Shanghai) Co., Ltd. Consortium;

3. Shenzhen Architectural Design and Research Institute Co., Ltd., HELLER MANUS, INC. (Heman (Shanghai) Architectural Design Consulting Co., Ltd., Hangzhou Planning and Design Institute Consortium;

4. Tsinghua University Architectural Design and Research Institute Co., Ltd., Beijing Tsinghua Tongheng Planning and Design Institute Co., Ltd., and Boeri Architectural Design Consulting (Shanghai) Co., Ltd. Consortium;

Finalist | The results of the international solicitation of the conceptual scheme of the source of scientific and technological innovation in Jinyi Lake

Three: competition review

Official Announcement! 1200W, global solicitation | The heart of Zhejiang, Jinyi Lake Science and Technology Innovation Source, the concept of the international solicitation of proposals

1. Project Overview

In the past 20 years since its establishment, Jinyi New District (Jindong District) has experienced three stages of development from industrial park, to pastoral smart city, to provincial new area, positioning from an industrial town, a logistics hub, to a pastoral smart city, a new urban area, and then to a growth-level and future new center in central Zhejiang.

At the level of Jinyi New District, various sectors are dislocated and linked, with the Jinmanhu area taking the big science and technology innovation and new international trade as the core, the new logistics and new international trade of the International Trade Comprehensive Reform Pilot Zone as the core, the East China Intermodal Transport New City and the Airport Economic Zone taking the new logistics as the core, and the Jinhua Science and Technology City, where the project is located, taking the big science and technology innovation and big intelligent manufacturing as the core.

Located in the west of Jinyi New Town, the source of Jinyi Lake Science and Technology Innovation is the core sector of Jinhua's science and technology innovation and intelligent manufacturing industry platform and science, education, cultural and creative functions. It plays an important role in the spatial pattern of urban charm in Jinyi New District, and is the center of gravity that dominates the city's two mountains and one park, the scenery belt along the river and the blue-green space network of the whole region. It is committed to developing into an urban area with a high degree of coordination between industry, city, people and ecological environment, positioning it as a science and technology innovation core and landscape meeting room in central Zhejiang, with R&D and intelligent manufacturing as the core, to create a new space for ecological charm in the future Jinyi New District, a new engine for industrial upgrading and a new model for future life, and help Jinyi New District become a growth pole and a new center in the future

2. Solicitation content

Finalist | The results of the international solicitation of the conceptual scheme of the source of scientific and technological innovation in Jinyi Lake

1. Coordinated research on the source of science and technology innovation in Jinyi Lake

It is about 13.9 square kilometers. It is the core functional area within a radius of 2km of Jinyi Lake, with Guangshun Road in the east, Xincheng Road in the south, Zongsan Road in the west, Mingli Street and Shanghai-Kunming Expressway in the north.

Finalist | The results of the international solicitation of the conceptual scheme of the source of scientific and technological innovation in Jinyi Lake

2. Conceptual scheme design

the overall design of the science and technology innovation center and the belt around the lake; 16 plots, with a land area of 61.48 hectares and a capacity area of 817,000 square meters.

Finalist | The results of the international solicitation of the conceptual scheme of the source of scientific and technological innovation in Jinyi Lake
Finalist | The results of the international solicitation of the conceptual scheme of the source of scientific and technological innovation in Jinyi Lake
Finalist | The results of the international solicitation of the conceptual scheme of the source of scientific and technological innovation in Jinyi Lake

3. Functional requirements

Research Office (Plot 01 01 to Plot 01 06)

It integrates the scientific research office, headquarters research and development, higher education incubation, intelligent manufacturing, and creative communication in the lake area. It is necessary to clarify the format, layout, height, column network layout, structural scheme and other contents of the development, and consider the functional connection with the surrounding plots.

It integrates the scientific research office, headquarters research and development, higher education incubation, intelligent manufacturing, and creative communication in the lake area. It is necessary to clarify the format, layout, height, column network layout, structural scheme and other contents of the development, and consider the functional connection with the surrounding plots. 3. Registration requirements

1. The applicant must be an independent legal person enterprise or institution legally registered at home and abroad;

2. Consortium registration is allowed, and the number of consortium members (including lead units) shall not exceed 3; Since this project is an international solicitation of conceptual solutions, domestic and foreign design units are encouraged to form a consortium to register, and overseas design units can be foreign design companies or their branches in China;

3. Applicants need to log in to the website: http://t1.ink/f/q7yfqx before 17:00 on April 25, 2024, or scan the QR code:

4. Pre-qualification

The Prequalification Review Committee adopts the method of eliminating registered voting round by round, selects 3 shortlisted units from the qualified applicants, and selects 1 alternative applicant unit, and the alternative applicant units will be replaced in order when the shortlisted applicants withdraw.

Five: Solicitation fee

1. Selected units: a total of RMB 10 million; Awarded a detailed design contract, the total amount of the contract includes bonuses;

2. Shortlisted (unselected) units: the second place (except for the winning plan, the unit with the highest program review results) will be compensated with RMB 1.2 million, and the third place (except for the selected plan, the unit with the lowest ranking in the program review results) will be compensated with RMB 800,000.

#头条创作挑战赛##全球设计灵感##建筑##城市画册##设计##金华##金华头条#

Read on