The West Extension High-speed Railway constructed by China Railway 11th Bureau Group crosses the Xixian North Ring Line Bridge for turnaround docking (taken on June 28, drone photo).
The Xi'an-Yan'an high-speed railway is the first high-speed railway in the old revolutionary base area of northern Shaanxi, with a total length of about 299 kilometers. After completion and operation, the running time from Xi'an to Yan'an will be shortened from the current two and a half hours to about one hour.
On June 28, the construction personnel completed the turnaround docking in the operation of the West Extension High-speed Railway across the Xixian North Ring Line Bridge undertaken by China Railway 11th Bureau Group.
On the same day, after about 1 hour of intense construction, the double body of the West Extension High-speed Railway Bridge across the Xixian North Ring Line undertaken by China Railway Eleventh Bureau Group rotated 66 degrees counterclockwise in the same direction, and the two 10,000-ton bridges were successfully turned and docked.
On June 28, the West Extension High-speed Railway Bridge across the Xixian North Ring Line constructed by China Railway 11th Bureau Group completed the turnaround docking (drone photo).
Source: Xinhua News Agency