laitimes

Congratulate! The Dalat Banner Photovoltaic + Mining Area Green Power Comprehensive Substitution Demonstration Project was successfully connected to the grid for power generation

author:Dalat release

On June 21, the 6MW photovoltaic + green power comprehensive substitution demonstration project in Dianshigou Coal Mine was successfully connected to the grid.

Congratulate! The Dalat Banner Photovoltaic + Mining Area Green Power Comprehensive Substitution Demonstration Project was successfully connected to the grid for power generation

The 6MW photovoltaic + green power comprehensive substitution demonstration project in the reclamation area of Dianshigou Coal Mine Reclamation Area is located in the reclamation area of Dianshigou Coal Mine Dump in Fengshuiliang Town, covering an area of about 200 acres, with a total investment of 32 million yuan and a total installed capacity of 6MW, 75% of the power generation load of the project provides green power supply for the production, living and charging and replacement of new energy logistics scenarios of Dianshigou Coal Mine.

Congratulate! The Dalat Banner Photovoltaic + Mining Area Green Power Comprehensive Substitution Demonstration Project was successfully connected to the grid for power generation

The project is a demonstration project of "photovoltaic + open-pit coal mine reclamation area ecological restoration and governance" in Dalat Banner, which is expected to generate 10 million kilowatt-hours of electricity annually, save nearly 3,000 tons of standard coal and reduce carbon dioxide emissions by nearly 8,000 tons per year, achieving a win-win situation of green mining and energy conservation and emission reduction. At the same time, the photovoltaic farm area of the project organically combines photovoltaic power generation with coal mine reclamation, and plants high-quality and high-protein forage under and between photovoltaic panels, which not only achieves the effect of building green mines and restoring the ecological environment, but also realizes the new industrial ecological model of "photovoltaic + ecological restoration of reclamation area", which will lead the new type of traditional industries, build a new way of production and life of green energy mines, and promote the coordinated development of traditional energy industry and new energy industry. "On-board power generation, under-plate restoration, and inter-plate planting" maximize the ecological, social and economic benefits.

Congratulate! The Dalat Banner Photovoltaic + Mining Area Green Power Comprehensive Substitution Demonstration Project was successfully connected to the grid for power generation

It is worth mentioning that the photovoltaic modules of the project use 570W double-sided double-glass N modules of Huida First Company, which promotes the upstream and downstream extension of the industrial chain according to local conditions, integrates the resources of various enterprises and projects, gives full play to the industrial agglomeration effect, forms a benign development pattern, and explores a new development path of "you have me, I have you, coordinated development, and win-win cooperation".

The grid-connected power generation of this project is not only a positive response of traditional energy enterprises in Dalat Banner to the development requirements of the new era of carbon peak and carbon neutrality, but also a leading demonstration for the construction of "new energy + green mines", effectively improving emission reduction and consumption reduction, upgrading the construction of green mines, making the open-pit coal mine dump truly reuse and sustainable development, building a "green energy mine" in the new era, and promoting the coordinated development of traditional industries and new energy industries to a new level.

Text: Wang Xiaoli, Li Huilong

Data and image source: Dalat Banner Energy Bureau

Read on