laitimes

Zhou Peng investigated the river chief system and flood control and drought relief

author:Lingqiu Fusion Media

On June 26, Zhou Peng, member of the Standing Committee of the Municipal Party Committee and secretary of the County Party Committee, went to Hongshiyuan Township and Wuling Town to investigate the river chief system and flood prevention and drought control. He stressed that it is necessary to firmly establish bottom-line thinking and systematic thinking, strictly implement the river chief system, earnestly strengthen the prevention of geological disasters and the investigation of hidden dangers, and do a good job in flood prevention and drought control in a strict, down-to-earth and meticulous manner, so as to ensure the safety of the people's lives and property. Li Lingjie, deputy county magistrate, and heads of the county party committee office and relevant departments attended.

Zhou Peng investigated the river chief system and flood control and drought relief
Zhou Peng investigated the river chief system and flood control and drought relief

Zhou Peng successively came to Shangbeiquan Village, Hongshiyuan Township, geological disaster hidden danger point, county emergency material reserve, Zeshuigou Donggou tailings pond, to investigate the Datong Shuishentang, Chengtouhui spring protection and water source replacement project and Beiquan cultural tourism project construction, geological disaster prevention and control, flood control and drought relief material reserves, "overhead storage" sales number and flood season safety preparations. Everywhere he went, Zhou Peng listened carefully to the briefing on the advancement, learned in detail about the next work plan and the existing problems and difficulties, and studied solutions with relevant departments and units in combination with the actual situation.

Zhou Peng investigated the river chief system and flood control and drought relief

During the investigation, Zhou Peng emphasized that it is necessary to promote the construction of the water god hall and the Chengtou Hui spring protection and water source replacement project with high standards and high quality, reverse the construction period, wall chart operation, and strictly control the safety, quality and progress of the project construction. It is necessary to strictly implement the requirements of the "river chief system", do a good job in the work of river chiefs at all levels patrolling the river, do a good job in river management and protection, water pollution prevention and control, and water environment management, so as to protect rivers and make good use of water resources. It is necessary to focus on improving the accuracy and pertinence of flood season forecasting and early warning, carry out in-depth investigation of geological hazards, effectively strengthen the monitoring of the operation of tailings ponds, do a solid job in emergency drills, staff training, material reserves, emergency duty, etc., effectively improve the ability to quickly respond to and properly deal with emergencies, improve the ability of the masses to prevent disasters and save themselves, and ensure the safety of people's lives and property.

Reporter: Yue Ruxin

Editor: Li Zhongren

Read on